My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Los Angeles River Path <br />LOS ANGELES, CA I 2018—ONGOING <br />Alta is co -leading the design of the landmark Los Angeles <br />River Path. This $365 million project —one of the largest <br />active transportation trail projects in the country —will close <br />an eight -mile gap in the path along the Los Angeles River <br />(LA River) in downtown Los Angeles and Vernon. Once <br />complete, the LA River Path will be a 32-mile continuous <br />pathway for walking and biking from Long Beach to the <br />San Fernando Valley, providing a world -class facility for <br />Angelenos and the region. <br />Alta's community -driven design approach focuses on user <br />experience and legibility. With Phase 1 completed, the Alta <br />team has led Metro through an alternatives analysis process <br />that resulted in board consent and approval to move into <br />environmental clearance and conceptual engineering. Over <br />the next six years, Alta will be leading path georrietrics, <br />assisting with the CEQA/NEPA process, developing <br />construction documents, supporting Army Corps and local <br />agency permitting, and providing construction support. <br />Merced Avenue Linear <br />Park and Traffic Calming <br />Improvements <br />EL MONTE, CA I 2020—ONGOING <br />This two-part project includes the final design of bicycle <br />facilities and pavement repair for a series of corridors in El <br />Monte, and the creation of a linear park on Merced Avenue. <br />The linear park will be created in a new median, and will <br />feature walking and biking paths, native plantings, stormwater <br />capture, public art, shade trees, and play areas. Alta is <br />providing final Plans, Specifications, and Estimate for the <br />linear park design. The plans include curb ramp details, <br />median plan and profile plans, grading details of the trail, <br />landscape and irrigation plans, amenity details, and signing <br />and striping plans. <br />To date, Alta worked with El Monte to support grant <br />applications for construction funding, provided a range of <br />concept designs, conducted extensive public outreach, <br />and created a fly -through animation to build support for the <br />project. <br />alta <br />CLIENT <br />PROJECT MANAGER <br />Los Angeles County <br />Emily Duchon <br />Metropolitan Authority (Metro) <br />RELEVANCE <br />CONTACT <br />Dolores Roybal Saltarelli <br />Regional trail planning, <br />Deputy Executive Officer <br />design and engineering <br />(213) 922-3024 <br />V Alternatives analysis <br />roybald@metro.net <br />Design guidelines <br />V Stakeholder engagement <br />CEQA/NEPA <br />documentation <br />alta <br />CLIENT PROJECT MANAGER <br />City of Pomona Public Works James Powell <br />Department <br />RELEVANCE <br />CONTACT V Streetscape design <br />Lee Torres, PE V PS&E <br />City Engineer <br />(626) 580-2055 Grant planning <br />Itorres@elmonteca.gov V CEQA documentation <br />ALTA PLANNING + DESIGN, INC. Proposal for RFP No. 23-030 On -Call Engineering Services 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.