Laserfiche WebLink
f1l, Lei g hton <br />Education <br />ME, Civil and Environmental <br />Engineering, MIT - 1997 <br />BS, Civil Engineering, University <br />of California, Berkley - 1993 <br />Carl specializes in soil mechanics, forensic investigations, and <br />geotechnical earthquake engineering. He has extensive experience in <br />evaluation of geotechnical engineering design and failure analysis. He <br />is an expert in seismic hazard analyses, non -linear analysis of structures <br />using earthquake time histories, liquefaction evaluations, slope stability <br />analyses, and foundation investigations. He has managed geotechnical <br />investigations to provide recommendations for design as well as forensic <br />investigations for litigation support. He has developed geotechnical <br />recommendations for deep and shallow foundation systems, pavement <br />design, remedial grading, shoring for deep excavations, and mitigation <br />of expansive soils and landslides. <br />Long Beach Airport Parking Structure I Long Beach, CA <br />Registration Principal- I n-Cha rge. Mr. Kim provided technical oversight and <br />Geotechnical Engineer: CA developed value -engineered foundation recommendations that enabled <br />(2620) supporting the 5-level parking structure on spread footings instead of <br />Civil Engineer: CA (58046) costlier pile foundations. <br />CFR 1910.120 OSHA 40-Hour <br />Westminster Police Station Parking Structure I Westminster, CA <br />Training <br />Principal- I n-Charge. Mr. Kim provided geotechnical services for the <br />CFR 1910.120 OSHA 8-Hour <br />City's new Police Department Parking structure. The four-story structure <br />Refresher Training <br />is located within a zone that is susceptible to liquefaction with a very <br />Respirator Fit Test <br />shallow historically high groundwater table. In addition, compressible <br />clay was encountered below the site. Driven pre -cast concrete piles will <br />support the proposed building. <br />LA Live Parking Structure I Los Angeles, CA <br />Staff Team. Developed and managed the geotechnical investigation and <br />geotechnical engineering support program for design and construction <br />of the 4-million square foot development adjoining STAPLES Center and <br />the Los Angeles Convention Center that features entertainment venues, <br />restaurants, retail commercial and residential spaces, television and <br />radio broadcast studios, and concert spaces. <br />Santa Monica Clock Tower Building I Santa Monica, CA <br />Project Manager. Developed and managed the geotechnical <br />consultation program for this seismic rehabilitation project, which <br />included a geologic/seismic hazards evaluation, development of site - <br />specific FEMA 356 BSE-1 and BSE-2 response spectra, and updated <br />foundation design recommendations. <br />City of Santa Ana Public Works Agency <br />Santo Ana On -Coll Engineering Services lqjff <br />