My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEP CAUFORNIA <br />E�gi� ... mg C.,p <br />Education <br />B.S., Electrical Engineering, <br />California State University, Los <br />Angeles <br />M.S., Electrical Engineering, <br />University of Southern California <br />A leader in delivering safe and efficient solutions, Ali helps forge <br />collaborative designs with clients, architects, consultants and contractors <br />to enhance building performance. As a power systems engineer, Ali is <br />skilled in power systems studies that include short-circuit analyses, device <br />coordination, arc flash studies, and equipment ratings and labeling. <br />He is committed to engagement, ideas and critical thinking with an <br />interdisciplinary approach to design that reduces risk and adds value for <br />the client. His extensive experience includes a wide range of projects in <br />the education, corporate commercial, civic and healthcare sectors. <br />Santa Ana Library I Santa Ana, CA (Currently Under Design) <br />Electrical Principal, Project Manager. MEP California is currently working <br />with KPFF and Group4 Architects for a full remodel of Santa Ana Library <br />and reconstruction of its electrical and mechanical systems. <br />Registration City of Santa Monica Thelma Terry Renovation I Santa Monica, CA <br />Licensed Professional Electrical Electrical Principal, Project Manager. Renovation of the community <br />Engineer, California #E21819 kitchen in the 740 SIF Thelma Terry Building, including all electric <br />cooking equipment. Existing electrical services sufficiently sized so that <br />no new distribution boards or transformers are required. <br />Department of Toxic Control Substances I Cypress, CA <br />Electrical Principal, Project Manager. The project will renovate the <br />approximately 35,000 square feet of the existing State of California <br />Department of Toxic Control Substances offices. Renovation includes <br />upgrades to data center, power, lighting, mechanical and ADA changes. <br />Ladera and Bassett Park I Los Angeles, CA <br />Electrical Principal, Project Manager. The historic recreational <br />buildings located within Ladera and Bassett Parks were remodeled and <br />modernized to attract the local community while preserving the historic <br />elements of these structures. <br />Orange County Transportation Authority Building I Orange <br />County, CA (Various Locations) <br />Electrical Principal, Project Manager, Lead Electrical Engineer. <br />Evaluation of 60 existing buildings within the Orange County <br />Transportation Authority portfolio. As a preventative maintenance <br />measure, we reviewed existing MEP equipment, personal protective <br />equipment, load study, short circuit, coordination and arc flash study. <br />City of Santa Ana Public Works Agency <br />Santa Ana On -Call Engineering Services kPff <br />
The URL can be used to link to this page
Your browser does not support the video tag.