Laserfiche WebLink
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 11 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />May 2, 2023 <br />TOPIC: Easement to Southern California Edison <br />AGENDA TITLE <br />Grant an Easement to Southern California Edison to Allow Underground Power to Serve <br />a Traffic Signal (Non -General Fund) <br />RECOMMENDED ACTION <br />Authorize the City Manager to execute an Easement Deed granting Southern California <br />Edison the right to own, place, and maintain power conduits and conductors <br />underground to serve APN 016-035-14. <br />DISCUSSION <br />In 2019, the City acquired a parcel of land located at 402 East Warner Avenue in <br />conjunction with the Warner Avenue Improvements Project from Main Street to Oak <br />Street. Along the east side of the parcel exists a 17-foot wide Maple Street Bike Trail <br />and Southern California Edison (SCE) power pole and overhead power lines serving the <br />residential lots fronting Maple Street and a traffic signal nearby (Exhibit 1). <br />As part of the Warner Avenue project, SCE will need to modify the power pole adjacent <br />to 402 East Warner to underground overhead facilities along Warner Avenue, and <br />provide service for proposed traffic signal at the Warner and Maple intersection. <br />Therefore, a non-exclusive easement is needed for SCE to construct, use, maintain, <br />operate, alter, add to, repair, replace, reconstruct, and inspect the underground <br />electrical supply system in order to continue distributing electrical energy to the <br />residents. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />EXHIBIT(S) <br />1. Easement Deed <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />