My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Glenwood Place Water Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 14 - Glenwood Place Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:56:35 AM
Creation date
8/10/2023 1:41:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 14 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />May 2, 2023 <br />TOPIC: Glenwood Place Water Improvements <br />AGENDA TITLE <br />Award a Construction Contract to Vido Samarzich, Inc. in the Amount of $978,455 for <br />the Glenwood Place Water Improvements Project, with an Estimated Project Delivery <br />Cost of $1,300,000 (Project No. 23-6476) (Non -General Fund) <br />RECOMMENDED ACTION <br />1. Award a construction contract to Vido Samarzich, Inc., the lowest responsible <br />bidder, in accordance with the base bid in the amount of $978,455 for the <br />construction of the Glenwood Place Water Improvements Project, for the term <br />beginning April 18, 2023 and ending upon project completion, and authorize the City <br />Manager to execute the contract subject to non -substantive changes approved by <br />the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$1,300,000, which includes $978,455 for the construction contract, $146,768 for <br />contract administration, inspection, and testing, and a $174,777 project contingency <br />for unanticipated or unforeseen work. <br />3. Determine these actions are exempt from further review in accordance with the <br />California Environmental Quality Act as Categorical Exemption Environmental <br />Review No. ER-2023-26 was filed for the project. <br />DISCUSSION <br />The Public Works Agency's Water Resources Division staff monitors the condition of <br />water main pipelines by assessing critical factors such as the history of breaks, pipe <br />size, alignment, location, and system redundancy to determine replacement priorities. <br />The water main on Glenwood Place has been identified for replacement (Exhibit 1). The <br />improvements include new polyvinyl chloride (PVC) water main, fire hydrants, water <br />services, appurtenances, asphalt concrete pavement, and traffic striping. Once <br />completed, water service reliability and general service quality will improve significantly. <br />In addition, the potential for disruption due to water main breaks will be substantially <br />reduced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.