My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Glenwood Place Water Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 14 - Glenwood Place Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:56:35 AM
Creation date
8/10/2023 1:41:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glenwood Place Water Improvements <br />May 2, 2023 <br />Page 3 <br />compliance, workmanship, and quality; and materials testing. As indicated in the Cost <br />Analysis (Exhibit 4) and as summarized in the table below, the estimated total <br />construction delivery cost of the project is $1,300,000. <br />Project Item <br />Total <br />Construction Contract <br />$978,455 <br />Construction Administration, Inspection, Testing <br />$146,768 <br />Contingencies <br />$174,777 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$1,300,000 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2023-36 was filed for the project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $1,300,000, which includes the construction contract, contract administration, <br />inspection, testing, and an authorized contingency. Funds for this action have been <br />transferred from previously -approved funds for the Fisher Park Neighborhood Water <br />Main Improvements (Project No. 19-6429) to the Glenwood Place Water Main <br />Improvements (Project No. 23-6476). <br />The following table summarizes the funds budgeted and available for expenditure to <br />deliver the construction of this project. Any remaining balances not expended at the end <br />of the fiscal year will be carried forward for expenditure in the following fiscal year if <br />needed. <br />Fiscal <br />Accounting Unit <br />Fund <br />Accounting Unit — <br />Year <br />— Account No. <br />Description <br />Account No. <br />Amount <br />Description <br />2022-23 <br />06617647-66301 <br />Acquisition & <br />Water Utility Capital <br />Projects, Water <br />$1,300,000 <br />(23-6476) <br />Construction <br />Capital Project <br />EXHIBIT(S) <br />1. Location Map <br />2. Bid Proposal <br />3. Construction Contract <br />4. Cost Analysis <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.