My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Well 32 Rehabilitation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 15 - Well 32 Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:57:05 AM
Creation date
8/10/2023 1:41:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.:13-6433 <br />WELL 32 REE AB=ATION REBID <br />Item <br />Description <br />Qty <br />Unk <br />Unft Price <br />Amount <br />28 <br />4-inch Blow Off <br />2 <br />BA <br />$l0j, 200 <br />$ 3$, q0V <br />29 <br />2-inch Air Valve <br />S <br />BA <br />$ 1 !;, 3ft, <br />S i4.scow <br />30 <br />Demolition at John Cardw Reservoir <br />Site (Chemical Facilities) <br />I <br />L3 <br />$ 8-C,a* e, • <br />$ <br />31 <br />John Garthe Chemical Facilities Yard <br />Piping, Utilities and Chemical Piping <br />LS <br />S 'y23, 0ae <br />S Z 2 3, eon <br />Reason Control and Chemical Igjection <br />32 <br />Vmk% Velves and Appurtenances <br />(Piping from Ste. 4 W 44 to Sta. 46+82 <br />I <br />LS <br />$ Z4?S, 7ov <br />S 111. 700 <br />and Ste. 70 % to Ste. 70+631 <br />Bad me Biew Demolition, Air Gap <br />33 <br />Catch Basin and Removal and <br />1 <br />LS <br />S $Zt Son - <br />$ S •L, SAa ' <br />lqduement of 16-inch water Main <br />On -Site Sodium Hypochlorite <br />34 <br />Generation Bquipment and Installation <br />1 <br />IS <br />$332,400 <br />$332,400 <br />I Wear Tecimologies) <br />All work with On-Sftc Sodium <br />6ypochlorite Generation EquipmM and <br />35 <br />Iotallation not included in Pre- <br />1 <br />LS <br />S &S, Ot) 0, <br />$ 6;.60o <br />Negotiated Proposel but required by <br />uds.c ifacatiom <br />36 <br />Zstroom"Facifftles <br />1 <br />LS <br />$ 3t, too - <br />$ 3 t, l ego <br />37 <br />ChemicaURsslmomBuilding <br />1 <br />LS <br />$842,0e. <br />S "Oil Z,.00 <br />38 <br />John Gaathe Chemical Facilities Site <br />linprovenuats <br />I <br />LS <br />$ Z210,300 <br />$ � p1'34a <br />39 <br />8tectrigal BgWpmcnt and Facilities <br />(Chemical Fadlldea) <br />1 <br />LS <br />$ Zt ,$oa- <br />_S 213, gam, <br />Instrumemtatiom sad Control Hquipmot <br />40 <br />and FacilitiesProbing <br />L <br />LS <br />S 14 Z, $w. <br />Facncluding <br />41 <br />Demolition at BxWting Jobn Garthe <br />Pomp Station (Electrical Upgrades) <br />y- <br />I <br />LS <br />$ -'510n o - <br />S �, oc*- <br />a2 <br />Electrical Bgndpmmnt and Control <br />Facilities (John Garthe Pump station) <br />I <br />Ls <br />Ste Z zGj z <br />, <br />$ l r 2 ZQ ?cn <br />P-3 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.