My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Well 32 Rehabilitation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 15 - Well 32 Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:57:05 AM
Creation date
8/10/2023 1:41:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 13-6433 <br />WELL 32 REHABILITATION RE -BID <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Pacific Hydrotech C4,V VICUU1, <br />REQUIREMENT: <br />-- 4 <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its <br />entirety and hereby <br />furnish all material and do all the work required to complete the said work in <br />proposes to <br />accordance with <br />said plans (if any) and the specifications for the unit price(s) or Iump sum(s) set forth in the <br />following schedule: <br />Item Description Qty Unit Unit Price <br />Amount <br />1 Mobilization/ Demobilization <br />�— - <br />1 <br />$ �3p,00r,- <br />- - -LS$63o,uoo.. <br />2 Sheeting, Shoring, Bracing and <br />EProtection <br />1 LS $ �' <br />$xcavation/Trench <br />3 Demolition at Existing Well 32 Site <br />ff <br />—I <br />1 LS $C%Sppo . <br />$ �lS,obo- <br />4 Well 32 Rehabilitation 1 LS <br />$ Soo, yoo <br />$ <br />S Well Pump, Motor, Piping and <br />+ Appurtenances within Well Building 1 LS $ f'' 6.3; oo <br />$ 6 t 6.3 <br />6 Well 32 Building 1 <br />r Well 32 Yard Piping <br />LS <br />$ C1 1 Z Sbv <br />including Water <br />7 and Sewer Connections, 2-inch Water 1 <br />Service and Drain Pipin <br />LS <br />$ 7_ 1 900 <br />$ <br />8 Well 32 Site Improvements at Morrison <br />Park 1 <br />LS <br />$ ZW3,Zoo <br />9 Electrical Equipment and Facilities <br />(Well 32 Facilities) 1 <br />LS <br />$ & 111 100 - <br />$ 611, I o0 <br />Instrumentation and Control Equipment <br />IU and Facilities including Programming 1 <br />(Well 32 Facilities) <br />LS <br />G <br />$ Zr 70° <br />$ IZ Zi 90p <br />11 Landscape and Irrigation Improvements <br />(Morrison Park) 1 <br />LS <br />$ r�0 p <br />$ ee, <br />P-1 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.