Laserfiche WebLink
PM/LA LA/QA PME/QA PE ENG ECAD HYENG SID SLD LCAD ADM SVY GEO EE SPOHN Total Reim. <br />$185 $195 $225 $200 $180 $140 $225 $155 $150 $125 $110 LS LS LS LS $$ <br />1 Preliminary Conceptual Plan 8 14 3,230$ -$ <br />2 Final Colored Plan 4 20 3,240$ -$ <br />3 Project Meetings 8 6 2,830$ -$ <br />4 Title Sheet 8 1,000$ -$ <br />5 Horizontal Control Plan 1 4 945$ -$ <br />6 Erosion Control Plan 1 3 765$ -$ <br />7 Composite Utility Plan 1 3 765$ -$ <br />8 Precise Grading Plan, Sections and Details 6 16 4,230$ -$ <br />9 WQMP 2 2 810$ -$ <br />10 Landscape Construction Plan and Details 2 12 1,870$ -$ <br />11 Electrical Plan and Details 3,900$ 3,900$ -$ <br />12 Irrigation Plan and Details 2 36 5,950$ -$ <br />13 Planting Plan and Details 2 12 1,870$ -$ <br />14 Skatepark Plan and Details 4 -$ 500$ -$ <br />15 Specifications 2 1 10 1,695$ -$ <br />16 Final Opinion of Probable Cost 1 2 8 1,515$ -$ <br />17 Plan Submittals, Approval Process and Permitting 2 4 8 32 6,710$ -$ <br />18 PSE Delivery 10 10 4,100$ -$ <br />19 Bid Assistance 2 2 3 1,420$ -$ <br />20 Construction Administration 40 8 32 8 12 6 4,175$ 24,385$ 900$ <br />21 As Built Plans 16 2 16 2 12 8 4 18 13,600$ 100$ <br />41,825$ -$ <br />CA 43,505$ 1,000$ <br />Grand Total 85,330$ 1,000$ <br />Reimbursable 1,000$ <br />Reimbursables included for budgetary purposes only. <br />Greyed out areas are not included in the total cost. <br />Legend: <br />PM/LA=Project Manager Landscape Architect, LA/QA - Senior Landscape Architect / Quality <br />Assurance, PME= Project Manager Engineering, PE=Professional Engineer, ENG=Engineer, <br />HYENG=Hydrology Engineer, SID=Senior Irrigation Designer, LCAD=Landscape CAD, <br />ADM=Administrative, SVY=Survey, GEO= Geotechnical Engineer, EE=Electrical Engineer, <br />SPOHN=Skatepark Designer <br />Please note that scope and fee are negotiable. <br />City of Santa Ana <br />Standard - McFadden Park <br />Project Fee Schedule - Option 1 <br />Task & <br />Description