| 
								    CITY OF SANTA ANA 
<br />RFP NO.: 22-096 
<br />ON CALL EMERGENCY ASPHALT & PCC 
<br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation. 
<br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. 
<br />Item No. 2 - PCC Sidewalk (T=411) 
<br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC Sidewalk 
<br />shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete 
<br />Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the Standard 
<br />Specifications, plans, and contract document specifications. 
<br />Payment for PCC Sidewalk (T=4") shall be at the contract unit price bid per Square Foot as listed in the Fee 
<br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, 
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. Payment 
<br />for thickness (T=6") shall be paid 1.5 times the unit price. 
<br />Item No. 3 - PCC Curb Ramp 
<br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter and shall 
<br />be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs, 
<br />Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard 
<br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the City for each Task 
<br />Order. 
<br />Payment for PCC Curb Ramp shall be at the contract unit price bid per Linear Foot as listed in the Fee Proposal, 
<br />and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, 
<br />and incidentals as required and no additional compensation will be allowed therefore. 
<br />Item No. 4 - PCC Curb & Gutter (A-2-8) 
<br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter and shall 
<br />be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs, 
<br />Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard 
<br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the City for each Task 
<br />Order. 
<br />Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot as listed in the 
<br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, 
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. 
<br />Item No. 5- Furnish and Install New #6 Pull Box 
<br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest CA 
<br />MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract 
<br />Documents to be provided for each Task Order Work. The assumed material for placement shall be concrete and 
<br />any removal of an existing pull box shall be included in the price paid to furnish and install a new pull box and 
<br />no additional payment will be allowed therefore. 
<br />Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per Each as listed in 
<br />Page 6 of 8 
<br />
								 |