My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Emergency Asphalt and Concrete Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 20 - Agreements for On-Call Emergency Asphalt and Concrete Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:14:07 AM
Creation date
8/10/2023 1:50:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Ortiz, Construction Project Manager (714) 647-5624 <br />Price of Contract Dates <br />$1,357,230.06 6/2020 — 3/2021 <br />Type of Work <br />Minor PCC — Ramps, Sidewalk, Curb & Gutter, Driveways <br />8. Project Name <br />Gas Tax Local Street Improvements & Flower Street Sewer Manhole Improvements <br />Owner <br />City of Santa Ana <br />Principal Contact Phone <br />Michael Ortiz, Construction Project Manager (714) 647-5624 <br />Price of Contract Dates <br />$2,546,154 1/2020 — 5/2021 <br />Type of Work <br />Street Maintenance: ARHM Asphalt, Coldmill, Minor PCC (V-Gutter, Sidewalk, Driveway <br />Approach, Ramp, Curb & Gutter), Utility Adjusting <br />9. Proiect Name <br />Wild Canyon Block Wall Project <br />Owner <br />City of Colton <br />Principal Contact Phone <br />Jess Soto, P.E. (909) 370-5551 <br />Price of Contract Dates <br />$54,936.00 9/2021 - 10/2021 <br />Type of Work <br />Block Wall, Perforated Drain, Sidewalk Under Drain <br />10. Proiect Name <br />Mid -Block Crosswalk Installation Project <br />Owner <br />City of Redlands <br />Principal Contact Phone <br />Kyle Wagner, Construction Project Manager (909) 253-8698 <br />Price of Contract Dates <br />$103,499.01 8/2021— 10/2021 <br />Type of Work <br />Minor PCC — Ramps, Sidewalk <br />11. Project Name <br />Residential Street Repair Program & Alley Improvement <br />Owner <br />City of Santa Ana <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.