My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Fire Alarm System Devices Upgrade, Testing, Inspection and Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 22 - Fire Alarm System Devices Upgrade, Testing, Inspection and Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 1:54:05 PM
Creation date
8/10/2023 1:53:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Fire Alarm System Upgrade at Police Administration & Jail Buildings <br />–Phase II (60 & 62 Civic Center Plaza) <br />PROJECT NEED: <br />The original buildings were constructed in the 1990s. The regulations <br />for fire alarm systems require upgrades to current standards for <br />compliance. Phase I of this project was completed in 2020 and included <br />installation of the control panel at the Jail. This second Phase II is <br />necessary to complete the project to include the replacement of the <br />smoke detectors, manual pull stations, control relay, etc. <br />PROJECT TITLE: <br />Fire Alarm System Upgrade-Police <br />Administration & Jail Buildings- <br />Phase II <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Building <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Police Department Administration Susan Gorospe, Police Department 21-Mar-2023 <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />730,000 ------ <br />TOTAL 730,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />730,000 ------ <br />TOTAL 730,000 ------ <br />EXHIBIT 2
The URL can be used to link to this page
Your browser does not support the video tag.