Laserfiche WebLink
<br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGESACCOUNTMISCELLANEOUS FEE UNIT <br />51611 <br />51611 <br />9) Backflow prevention device Each 12.75 13.27 <br />13.2710) For each appliance or piece of equipment regulated <br />by this code for which no fee is listed <br />Each 12.75 <br />51611 11) Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />and Sunday inspections) <br />Per Hour 107.91 112.33 <br />51611 <br />51611 <br />51611 <br />12) Re-inspection fee assessed under provisions of the <br />Building Code <br />Per Hour <br />Per Hour <br />Per Hour <br />107.91 <br />107.91 <br />107.91 <br />112.33 <br />112.33 <br />112.33 <br />13) Inspections for which no fee is specifically indicated <br />(minimum charge - one (1) hour) <br />14) Additional plan review required by changes, <br />additions, or revisions to approved plans (minimum <br />charge - one (1) hour) <br />SOLAR PLAN CHECK FEES <br />Whenever solar plans are required by the Building Official, <br />plan check fees shall be 65% of the solar permit fee and <br />shall be paid at the time of submitting plans. <br />51601 <br />53641 <br />Electronic Plan Submittal Fee <br />Structural Peer Review <br />25.88 26.94 <br />At Cost At Cost <br />Page 85 of 148