My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:59:18 PM
Creation date
8/10/2023 3:54:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
52
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGESACCOUNTMISCELLANEOUS FEE UNIT <br />51611 <br />51611 <br />9) Backflow prevention device Each 12.75 13.27 <br />13.2710) For each appliance or piece of equipment regulated <br />by this code for which no fee is listed <br />Each 12.75 <br />51611 11) Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />and Sunday inspections) <br />Per Hour 107.91 112.33 <br />51611 <br />51611 <br />51611 <br />12) Re-inspection fee assessed under provisions of the <br />Building Code <br />Per Hour <br />Per Hour <br />Per Hour <br />107.91 <br />107.91 <br />107.91 <br />112.33 <br />112.33 <br />112.33 <br />13) Inspections for which no fee is specifically indicated <br />(minimum charge - one (1) hour) <br />14) Additional plan review required by changes, <br />additions, or revisions to approved plans (minimum <br />charge - one (1) hour) <br />SOLAR PLAN CHECK FEES <br />Whenever solar plans are required by the Building Official, <br />plan check fees shall be 65% of the solar permit fee and <br />shall be paid at the time of submitting plans. <br />51601 <br />53641 <br />Electronic Plan Submittal Fee <br />Structural Peer Review <br />25.88 26.94 <br />At Cost At Cost <br />Page 85 of 148
The URL can be used to link to this page
Your browser does not support the video tag.