Laserfiche WebLink
<br />Existing Fee: <br />Proposed Fee: <br />Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Actual Cost <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br />11.Work Performance & Payment - Deposit (Refundable) <br />Based on approved Engineer’s estimate <br />Existing Fee: <br />Proposed Fee: <br />Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Actual Cost <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br />12.Omnibus Concrete - Deposit (Non-Refundable) <br />Based on approved Engineer’s estimate <br />Existing Fee: <br />Proposed Fee: <br />Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Actual Cost <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br />13.Developer Contribution - Deposit (Non-Refundable) <br />Based on approved Engineer’s estimate <br />Existing Fee: <br />Proposed Fee: <br />Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Actual Cost <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br />14.Accelerated Improvement Plan Check Initial Deposit (Streets, Utilities, Maps, etc.) <br />Page 146 of 148