Laserfiche WebLink
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:The Bristol Street Improvements project was planned and designed to incorporate complete street concepts with storm drain quality features. The improvements include widening of the street from four lanes to six lanes, with bus turnouts, raised median, bike lanes, and sound walls. The project also brings native and organic landscaping that beautifies a fully developed urban area.PROJECT NEED:Bristol Street from Civic Center to Washington (Phase 3A) is part of the City's plan to widen Bristol Street from Warner Avenue to Memory Lane, which was approved by City Council in 1990 and reevaluated in 2015. Existing roadway has only 2 lanes in each direction and is operating at a LOS F. This widening is needed to improve traffic flow and create complete streets features.PROJECT TITLE:Bristol St Improvements & Widening: Phase 3A - Civic Center-WashingtonPROJECT CATEGORY:Street ImprovementsStreet/Bridge Improvements & WideningLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP EngineeringSean Thomas, Senior Civil EngineerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction1,965,470------Right-Of-Way-------TOTAL1,965,470------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30MEASURE M2 COMPETITIVE1,965,470------OCTA BRISTOL ST CORRIDOR-------TSIA AREA F-------TOTAL1,965,470------17