Laserfiche WebLink
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:Reconstruction/resurfacing of existing pavement and replacement/installation of missing or damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps along Bristol Street between Santa Clara Avenue and Memory Lane.PROJECT NEED:This segment of roadway has been identified as a high priority by the City's Pavement Management System. The pavement is deteriorating due to weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement.PROJECT TITLE:Bristol St Rehab: Santa Clara to Memory LnPROJECT CATEGORY:Street ImprovementsArterial Street RehabilitationLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP EngineeringSean Thomas, Senior Civil EngineerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction1,480,000------TOTAL1,480,000------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30RMRA SB11,480,000------TOTAL1,480,000------19