My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:59:18 PM
Creation date
8/10/2023 3:54:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
52
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:The proposed improvements would include the widening of Fairview Street with a cross section of 100' wide right-of-way and and will include 3 lanes in each direction, raised median, Class II bike lane, and 8' wide sidewalk with tree wells. Additionally, the proposed improvements would entail widening of the Fairview Street Bridge, relocation of existing utilities, including several power poles, street lights, and partial acquisition of 2 parcels.PROJECT NEED:Fairview Street is currently a four-lane undivided arterial between 9th Street and 16th Street. This segment of Fairview Street currently carries 38,544 vehicles per day (VPD) and has a volume to capacity of (V/C) ratio of 1.03. At this V/C ration, this roadway segment operates at an unacceptable level of service. LOS F exists where the traffic stream is extremely difficult. With the proposed improvements, this roadway segment will improve to acceptable LOS B.PROJECT TITLE:Fairview Bridge and Street ImprovementsPROJECT CATEGORY:Street ImprovementsStreet/Bridge Improvements & WideningLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP EngineeringJason Gabriel, Principal Civil EngineerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction400,000------Engineering200,000------Right-Of-Way-------TOTAL600,000------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30GAS TAX-------M2 LOCAL FAIRSHARE600,000------TSIA AREA F-------TOTAL600,000------24
The URL can be used to link to this page
Your browser does not support the video tag.