My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:59:18 PM
Creation date
8/10/2023 3:54:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
52
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:The King Street Urban Greening Project features the transformation of approximately 9,000 square-feet of unused public space at the intersection of King Street and 10th Street. The Project includes bicycle and pedestrian pathways, drought tolerant landscaping, lighting, waste receptacles, seating, interpretive signage, art installations, and a stormwater infiltration system that will capture and infiltrate stormwater runoff form the surrounding neighborhood.PROJECT NEED:The abandoned street area at the intersection of King Street and 10th Street is unused and is subject to illegal dumping. The Project will beautify this public space and provide benefits to the surrounding community. The Project will also help improve water quality, enhance local water supply, and reduce flooding via the infiltration of stormwater runoff . The Project connects the Artesia Pilar neighborhood to Fairview Street via the installation of pedestrian and bicycle pathways.PROJECT TITLE:King Street Urban Greening ProjectPROJECT CATEGORY:Utility/Drainage/LightingImprovementsStorm Drain/Water QualityLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP Engineering Craig Foster, NPDES ManagerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction-------Engineering24,000------TOTAL24,000------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30CNRA Urban Flood Protection-------FED CLEAN WATER24,000------TOTAL24,000------49
The URL can be used to link to this page
Your browser does not support the video tag.