Laserfiche WebLink
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:The King Street Urban Greening Project features the transformation of approximately 9,000 square-feet of unused public space at the intersection of King Street and 10th Street. The Project includes bicycle and pedestrian pathways, drought tolerant landscaping, lighting, waste receptacles, seating, interpretive signage, art installations, and a stormwater infiltration system that will capture and infiltrate stormwater runoff form the surrounding neighborhood.PROJECT NEED:The abandoned street area at the intersection of King Street and 10th Street is unused and is subject to illegal dumping. The Project will beautify this public space and provide benefits to the surrounding community. The Project will also help improve water quality, enhance local water supply, and reduce flooding via the infiltration of stormwater runoff . The Project connects the Artesia Pilar neighborhood to Fairview Street via the installation of pedestrian and bicycle pathways.PROJECT TITLE:King Street Urban Greening ProjectPROJECT CATEGORY:Utility/Drainage/LightingImprovementsStorm Drain/Water QualityLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP Engineering Craig Foster, NPDES ManagerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction-------Engineering24,000------TOTAL24,000------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30CNRA Urban Flood Protection-------FED CLEAN WATER24,000------TOTAL24,000------49