My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:59:18 PM
Creation date
8/10/2023 3:54:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
52
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A refundable deposit will be collected on Commercial C&D projects to ensure proper collection and recycling of Construction & Demolition debris. The deposit will be calculated at $1 per square foot, with a minimum deposit of $500 and a maximum of $75,000. This new plan review process for Construction & Demolition waste is mandated by the State of California and is established in SAMC Sec. 16-36. The following fees are already being collected by the City and exist in the Land Management System, SAPIN, but are not listed in the Miscellaneous Fee Schedule. Prior to the implementation of a new system, Clariti, fees need to be added so that SAPIN/Clariti and the fee schedule have a 1:1 match. 5. Transportation System Improvement AreaExisting Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: Miscellaneous Fee Unit Fee Transportation System Improvement Area, Non-Residential - Area A Per Square Foot $ 5.15 Transportation System Improvement Area, Non-Residential - Area B Per Square Foot $ 1.81 Transportation System Improvement Area, Non-Residential - Area C Per Square Foot $ 5.53 Transportation System Improvement Area, Non-Residential - Area D Per Square Foot $ 3.31 Transportation System Improvement Area, Non-Residential - Area E Per Square Foot $ 2.01 Transportation System Improvement Area, Non-Residential - Area F Per Square Foot $ 1.81 Transportation System Improvement Area, Residential - Multi-Family, Area A Per Square Foot $ 1.10 Transportation System Improvement Area, Residential - Multi-Family, Area B Per Square Foot $ 1.10 Transportation System Improvement Area, Residential - Multi-Family, Area C Per Square Foot $ 1.10 Transportation System Improvement Area, Residential - Multi-Family, Area D Per Square Foot $ 1.10 Transportation System Improvement Area, Residential - Multi-Family, Area E Per Square Foot $ 1.10 Transportation System Improvement Area, Residential - Multi-Family, Area F Per Square Foot $ 1.10 Transportation System Improvement Area, Residential - Single-Family, Area A Per Square Foot $ 1.80 Transportation System Improvement Area, Residential - Single-Family, Area B Per Square Foot $ 1.80 Transportation System Improvement Area, Residential - Single-Family, Area C Per Square Foot $ 1.80 Transportation System Improvement Area, Residential - Single-Family, Area D Per Square Foot $ 1.80 Transportation System Improvement Area, Residential - Single-Family, Area E Per Square Foot $ 1.80 Transportation System Improvement Area, Residential - Single-Family, Area F Per Square Foot $ 1.80 Page 868 of 876
The URL can be used to link to this page
Your browser does not support the video tag.