Laserfiche WebLink
<br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGESACCOUNTMISCELLANEOUS FEE UNIT <br />51600 125)Permit Issuance Fee - General Plan Update surcharge f) <br />Permit Renewal/Extension Fee <br />Flat <br />Flat <br />24.62 25.63 <br />93.0151601 <br />51602 <br />51603 <br />51604 <br />126)89.35 <br />(per permit renewed or extended) <br />51601 127a)Residential Photovoltaic System (1kW to 15kW) <br />Plus each additional kW over 15kW <br />Flat 450.00 <br />15.00 <br />450.00 <br />15.00Each <br />127b) <br />127c) <br />Residential Thermal Systems (1kwth to 10 kWth) <br />Plus each additional kWth over 10kWth <br />Flat <br />Each <br />450.00 <br />15.00 <br />450.00 <br />15.00 <br />Commercial Rooftop Solar (1kW to 50kW) <br />Plus each additional kW over 50kW up to 250 kW <br />Plus each additional kW over 250kW <br />Flat <br />Each <br />Each <br />1,000.00 <br />7.00 <br />1,000.00 <br />7.00 <br />5.00 5.00 <br />127d)Commercial Thermal Systems (1kWth up to 30kWth) <br />Plus each additional kWth between 30kWth up to 260kWth <br />Plus each additional kWth over 260kW <br />Flat <br />Each <br />Each <br />1,000.00 <br />7.00 <br />1,000.00 <br />7.00 <br />5.00 5.00 <br />53600 <br />51601 <br />51601 <br />51601 <br />53600 <br />53600 <br />128) <br />129) <br />130) <br />131) <br />132) <br />133) <br />Solar Panel - Structural Plan Check Hourly <br />Flat <br />247.72 <br />364.91 <br />257.88 <br />379.87 <br />1,144.76 <br />186.02 <br />257.88 <br />257.88 <br />Solar Panel - Inspection Residential <br />Solar Panel - Inspection Commercial <br />Field Plan Check - Subject to Field Structural Plan Check <br />Cell Tower - Structural Plan Check <br />Flat 1,099.67 <br />178.69Hourly <br />Hourly <br />Hourly <br />247.72 <br />Deferred Submittal - Structural Plan Check 247.72 <br />Page 63 of 148