Laserfiche WebLink
<br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGESACCOUNTMISCELLANEOUS FEE UNIT <br />Note: The volume for Plan Check activity has been reduced to <br />reflect the fact that contract services and overtime are used to <br />complete a portion of activity. <br />a) Not all re-roofing activities require plan check. Material and current <br />structure design will be the deciding factor. <br />b) This service will be charged an initial deposit and then charged by hourly rate. <br />c) These services were reallocated across fee areas as an overhead. <br />d) Up to 10 racks. Each additional rack will be charged at $13.28 each. <br />e) Hourly rates will be charged after the minimum is met, if required. <br />13.28 13.82 <br />f) This revenue is earmarked for the General Plan Update and is not included in new <br />revenue figures. All plan check services reflect an initial plus two rechecks. Additional <br />reviews will be charged on an hourly basis. Any unique plan check or inspection that <br />does not match a service category will be charged on an hourly basis. <br />Electrical Fees <br />51603 <br />51603 <br />53601 <br />51603 <br />51603 <br />51603 <br />51603 <br />51603 <br />165) <br />166) <br />167) <br />168) <br />169) <br />170) <br />171) <br />172) <br />Permit Issuance 61.38 <br />81.83 <br />63.90 <br />85.19Minimum Fee (Nonresidential) <br />Electrical Plan Check Fee (when required) <br />125 Volt Receptacle Outlets <br />65% of Subtotal <br />1.62 <br />65% of Subtotal <br />1.69 <br />Light Switches, Occupancy Sensors <br />Light Fixtures <br />1.76 1.83 <br />1.17 1.22 <br />Air Conditioners, Heat Pumps <br />Factory-Wired Units (Solid Hook-Ups) <br />108.05 112.48 <br />27.64 28.77 <br />Page 68 of 148