Laserfiche WebLink
<br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGESACCOUNTMISCELLANEOUS FEE UNIT <br />New or Total Rewire for Single Family Dwellings: <br />SFD (per square foot)51603 <br />51603 <br />51603 <br />199) <br />200) <br />201) <br />sq. ft. <br />sq. ft. <br />0.17 0.18 <br />0.18Garage (per square foot)0.17 <br />Temporary Electrical Service, Prior to approval or <br />Occupancy (30 Days) <br />Each Meter 272.17 283.33 <br />At the time of application for temporary power, the owner <br />shall post a $1,000 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is issued. <br />Mechanical Fees <br />51604 <br />51604 <br />53603 <br />202) <br />203) <br />204) <br />Permit Issuance Fee 61.38 <br />81.83 <br />63.90 <br />85.19Minimum Fee (Nonresidential) <br />Stand Alone Mechanical Plan Check 65% of Subtotal 65% of Subtotal <br />Furnace including ducts & vents (each) <br />Up to 100,000 BTU51604 <br />51604 <br />51604 <br />205) <br />206) <br />207) <br />73.13 <br />104.35 <br />141.49 <br />76.13 <br />108.63 <br />147.29 <br />Over 100,000 BTU <br />Furnace/Compressor Combo (Residential) <br />Each Compressor, Boiler or Heat Pump (packaged or split system) <br />Up to 5 HP51604 <br />51604 <br />51604 <br />208) <br />209) <br />210) <br />100.57 <br />120.26 <br />150.32 <br />104.69 <br />125.19 <br />156.48 <br />Over 5 to 30 HP <br />Over 30 to 50 HP <br />Page 71 of 148