My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:32:44 PM
Creation date
8/10/2023 4:31:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana 2020 Urban Water Management Plan <br />arcadis.com <br />ES-1 <br />EXECUTIVE SUMMARY <br />INTRODUCTION AND UWMP OVERVIEW <br />The City of Santa Ana prepared this 2020 Urban Water Management Plan (UWMP) to submit to the <br />California Department of Water Resources (DWR) to satisfy the UWMP Act of 1983 (UWMP Act or Act) <br />and subsequent California Water Code (Water Code) requirements. The City is a retail water supplier that <br />provides water to its residents and other customers using the imported potable water supply obtained <br />from its regional wholesaler, Metropolitan Water District of Southern California (MET), local groundwater <br />from the Orange County Groundwater Basin (OC Basin), and recycled water from the Orange County <br />Water District (OCWD). <br />UWMPs are comprehensive documents that present an evaluation of a water supplier’s reliability over a <br />long-term (20-25 year) horizon. This 2020 UWMP provides an assessment of the present and future <br />water supply sources and demands within the City’s service area. It presents an update to the 2015 <br />UWMP on the City’s water resource needs, water use efficiency programs, water reliability assessment <br />and strategies to mitigate water shortage conditions. It also presents a new 2020 Water Shortage <br />Contingency Plan (WSCP) designed to prepare for and respond to water shortages. This 2020 UWMP <br />contains all elements to meet compliance of the new requirements of the Act as amended since 2015. <br />UWMP PREPARATION <br />The City coordinated the preparation of this 2020 UWMP with other key entities, including MET (regional <br />wholesaler for Southern California and the direct supplier of imported water to the City, Municipal Water <br />District of Orange County ([MWDOC] (regional wholesale supplier for OC)), and OCWD (OC Basin <br />manager and provider of recycled water in north OC). While the City is not a member agency of MWDOC, <br />the City developed this UWMP in conjunction with other MWDOC-led efforts such as population projection <br />from the Center for Demographic Research at California State University Fullerton (CDR). <br />SYSTEM DESCRIPTION <br />Governed by a non-partisan seven-member City Council, the City is one of the oldest cities in Orange <br />County, incorporated in 1886 and became an original member agency of the MET on February 27, 1931. <br />The City’s water service area covers 27.5 square miles and includes the City of Santa Ana and a small <br />neighborhood in the City of Orange, near Tustin Avenue and Fairhaven by the northeast corner of Santa <br />Ana. The City operates ten reservoirs with a storage capacity of 49 million gallons (MG), seven pumping <br />stations, 21 groundwater wells, four pressure regulating stations and seven import water connections and <br />manages 510-mile water mains system with 45,037 service connections. <br />Situated in the South Coast Air Basin (SCAB), the City’s climate is characterized by Southern California’s <br />“Mediterranean” climate with mild winters, warm summers and moderate rainfall. Regarding land use, the <br />City is predominantly single and multi-family residential community. Moving forward, the City will continue <br />planning for its Regional Housing Needs Assessment (RHNA) allocation and future planned <br />developments beyond 2020 will primarily be multiuse projects, in the ‘focus areas’ identified in the City’s <br />General Plan. The current population of 335,086 is projected to increase by 2.9% over the next 25 years.
The URL can be used to link to this page
Your browser does not support the video tag.