My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:32:44 PM
Creation date
8/10/2023 4:31:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
View images
View plain text
Santa Ana 2020 Urban Water Management Plan <br />arcadis.com <br />1-2 <br />The various key new additions in the 2020 UWMP included as a result of the most recent water <br />regulations are: <br />Water Shortage Contingency Plan (WSCP) – WSCP helps a Supplier to better prepare for <br />drought conditions and provides the steps and water use efficiency measures to be taken in times <br />of water shortage conditions. WSCP now has more prescriptive elements, including an analysis <br />of water supply reliability; the water use efficiency measures for each of the six standard water <br />shortage levels, that correspond to water shortage percentages ranging from 0 - 10% to greater <br />than 50%; an estimate of potential to close supply gap for each measure; protocols and <br />procedures to communicate identified actions for any current or predicted water shortage <br />conditions; procedures for an annual water supply and demand assessment; monitoring and <br />reporting requirements to determine customer compliance; reevaluation and improvement <br />procedures for evaluating the WSCP. <br />Drought Risk Assessment – The Suppliers are now required to compare their total water use <br />and supply projections and conduct a reliability assessment of all their sources for a consecutive <br />five-year drought period beginning 2021. <br />Five Consecutive Dry-Year Water Reliability Assessment - The three-year multiple dry year <br />reliability assessment in previous UWMPs has now been extended from three to five consecutive <br />dry years to include a more comprehensive assessment of the reliability of the water sources to <br />improve preparedness of Suppliers for extended drought conditions. <br />Seismic Risk – The UWMP now includes a seismic risk assessment of the water supply <br />infrastructure and a plan to mitigate any seismic risks on the water supply assets. <br />Groundwater Supplies Coordination – The UWMP should be in accordance with the <br />Sustainable Groundwater Management Act of 2014 and consistent with the Groundwater <br />Sustainability Plans, wherever applicable. <br />Lay Description – To provide a better understanding of the UWMP to the general public, a lay <br />description of the UWMP is included, especially summarizing the Supplier’s detailed water <br />service reliability assessment and the planned management steps and actions to mitigate any <br />possible shortage scenarios. <br />UWMP Organization <br />This UWMP is organized into 10 main sections aligned with the DWR Guidebook recommendations. <br />The subsections are customized to tell the City’s story of water supply reliability and ways to overcome <br />any water shortages over a planning horizon of the next 25 years. <br />Section 1 Introduction and UWMP Overview gives an overview of the UWMP fundamentals and briefly <br />describes the new additional requirements passed by the Legislature for 2020 UWMP. <br />Section 2 UWMP Preparation identifies this UWMP as an individual planning effort of the City, lists the <br />type of year and units of measure used and introduces the coordination and outreach activities conducted <br />by the City to develop this UWMP. <br />Section 3 System Description gives a background on the City’s water system and its climate <br />characteristics, population projection, demographics, socioeconomics, and predominant current and <br />projected land uses of its service area.
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).