My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:32:44 PM
Creation date
8/10/2023 4:31:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana 2020 Urban Water Management Plan <br />arcadis.com <br />3-10 <br /> South Bristol Street <br />These five areas are along major travel corridors, the Orange County Streetcar line, and/or linked to the <br />Downtown. The intent is to expand opportunities for development through a transition to multiuse land <br />use designations near transit corridors. The Industrial Flex designation is being introduced on areas <br />already designated for industrial land uses in order to allow for cleaner industrial and commercial uses, <br />professional office, and creative live-work spaces. <br />Additionally, the City has seven planning areas including specific plans and other special zoning areas, <br />that were adopted before the General Plan and have remaining development capacity: <br /> Adaptive Reuse Overlay (2014) <br /> Bristol Street Corridor Specific Plan (1991/2018) <br /> Harbor Mixed Use Corridor Specific Plan (2014) <br /> MainPlace Specific Plan (2019) <br /> Metro East Overlay Zone (2007/2018) <br /> Midtown Specific Plan (1996) <br /> Transit Zoning Code Specific Devt (2010) <br />Figure 3-4 below shows the above listed five focus areas and the seven planning areas of the City.
The URL can be used to link to this page
Your browser does not support the video tag.