My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Centennial Lake Circulation Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 15 - Centennial Lake Circulation Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:48:29 AM
Creation date
8/10/2023 4:55:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Add No. One <br />PROPOSAL <br />PROJECT NO.: 18-2681 <br />CENTENNIAL LAKE CIRCULATION RENOVATION <br />Bid Item <br />Unit <br />Description <br />Quantity <br />Unit <br />Amount <br />No. <br />Note No. <br />Price <br />CONSTRUCT LANDSCAPE <br />41 <br />CN-53 <br />PLANTER PER DETAIL 30 ON <br />4,200 <br />SF <br />$10 <br />$42,000 <br />SHEET 18 <br />INSTALL RELOCATED <br />42 <br />CN-56 <br />BOOKSHARE KIOSK AT <br />1 <br />EA <br />$800 <br />$800 <br />LOCATION SHOWN <br />FURNISH AND INSTALL PUMP <br />43 <br />CN-57 <br />VAULT TYPE B WITH EQUIPMENT <br />2 <br />EA <br />$186,000 <br />$372,000 <br />COMPLETE AS PER SHEET 21 <br />INSTALL 36" BOX AUSTRALIAN <br />44 <br />CN-58 <br />WILLOW (GIJEIRA <br />PARVIFLORA)PER CITY OF <br />12 <br />EA <br />$2,500 <br />$30,000 <br />SANTA ANA STD PLAN 1124B <br />FURNISH AND INSTALL 124NCH <br />45 <br />CN-59 <br />SCHED 40 PVC PIPE, LENGTH PER <br />51 <br />LF <br />$400 <br />$20,400 <br />PLAN. <br />INSTALL 3/4 INCH SCHEDULE 40 <br />PVC IRRIGATION LINE. TRENCH <br />46 <br />CN-66 <br />DETAILS PER SHEET 22. ROOT <br />265 <br />LF <br />$38 <br />$10,070 <br />WATERING BUBBLER AT EACH <br />TREE PER DETAIL 9 ON SHEET 22. <br />REMOVE EXIST PUMP, WIRING, <br />47 <br />DN-1 <br />VAULT, AND APPURTENANCES. <br />11 <br />EA <br />$1,000 <br />$11,000 <br />BACKFILL HOLE(S). <br />ABANDON EXISTING LAKE EDGE <br />48 <br />DN-2 <br />SKIMMER AND BACKFILL WITH <br />28 <br />EA <br />$800 <br />$22,400 <br />CONCRETE <br />49 <br />DN-3 <br />ABANDON EXIST PIPE IN -PLACE. <br />11 <br />EA <br />$15,400 <br />CAP/ PLUG CUT ENDS. <br />$1,400 <br />50 <br />DN-5 <br />REMOVE AND TEMPORARILY <br />2 <br />EA <br />$280 <br />$560 <br />STORE BOOKSHARE KIOSK <br />51 <br />DN-6 <br />RELOCATE PARK BENCH PER <br />2 <br />EA <br />$600 <br />$1,200 <br />SHEET 3 <br />REMOVE LIGHT STANDARD, <br />52 <br />DN-7 <br />FOUNDATION, CONDUIT, AND <br />1 <br />EA <br />$2,800 <br />$2,800 <br />WIRING. BACKFILL HOLE(S) <br />53 <br />DN-8 <br />REMOVE WOODEN POSTS AND <br />222 <br />LF <br />$10 <br />$2,220 <br />STEEL CABLE BARRICADE <br />RELOCATE AND RECONNECT <br />54 <br />DN-9 <br />EXISTING IRRIGATION PIPES TO <br />215 <br />LF <br />$14 <br />$3,010 <br />LIMITS SHOWN <br />P-4 of P-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.