My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Centennial Lake Circulation Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 15 - Centennial Lake Circulation Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:48:29 AM
Creation date
8/10/2023 4:55:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 . <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-2681 <br />CENTENNIAL LAKE CIRCULATION RENOVATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: CJW Construction. Inc <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Bid Item <br />Unit <br />No. <br />Note No. <br />Description <br />Quantity <br />Unit <br />Price <br />Amount <br />1 <br />DN-19 <br />CLEAR AND GRUB PER LIMITS <br />1 <br />LS <br />$98,000 <br />$98,000 <br />SHOWN <br />2 <br />DN-17 <br />UNCLASSIFIED EXCAVATION <br />1,450 <br />CY <br />$68 <br />$98,600 <br />FURNISH AND INSTALL 12-INCH <br />3 <br />CN-14 <br />C-900 DR-25 PR CL 165 PVC PIPE, <br />95 <br />LF <br />$72 <br />$6,840 <br />LENGTH PER PLAN. <br />CONSTRUCT CONCRETE LAKE <br />EDGE AT SIDEWALK / <br />4 <br />CN-1 <br />BOARDWALK PER PLAN, <br />155 <br />LF <br />$350 <br />$54,250 <br />CONSTRUCTION METHOD AND <br />DETAIL 02 ON SHEET 10 <br />CONSTRUCT CONCRETE LAKE <br />5 <br />CN-2 <br />EDGE PER PLAN AND DETAILS <br />480 <br />LF <br />$350 <br />$168,000 <br />ON SHEET 10 <br />GRADE MEANDERING STREAM <br />6 <br />CN-3 <br />PER PLAN AND INSTALL ROCK <br />255 <br />LF <br />$250 <br />$63,750 <br />LINING <br />CONSTRUCT CONCRETE BOAT <br />7 <br />CN-4 <br />RAMP PER DETAIL 12 ON SHEET <br />I <br />EA <br />$40,000 <br />$40,000 <br />12 <br />8 <br />CN-5 <br />CONSTRUCT MANMADE REEF 1 <br />6 <br />EA <br />$600 <br />$3,600 <br />PER DETAIL 05 ON SHEET 11 <br />9 <br />CN-6 <br />CONSTRUCT MANMADE REEF 2 <br />2 <br />EA <br />$1,200 <br />$2,400 <br />PER DETAIL 06 ON SHEET 11 <br />10 <br />CN-7 <br />CONSTRUCT FOUNTAIN PER <br />1 <br />EA <br />$12,000 <br />$12,000 <br />DETAIL 07 ON SHEET 14 <br />FURNISH AND INSTALL <br />11 <br />CN-8 <br />WATERFOWL FOOD VENDING <br />7 <br />EA <br />$1,000 <br />$7,000 <br />MACHINE PER PLAN <br />CONSTRUCT CONCRETE STEPS <br />12 <br />CN-9 <br />PER PLAN AND DETAIL 32 ON <br />550 <br />SF <br />$80 <br />$44,000 <br />SHEET 18 <br />P-1 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.