My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Centennial Lake Circulation Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 15 - Centennial Lake Circulation Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:48:29 AM
Creation date
8/10/2023 4:55:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-2681 <br />CENTENNIAL LAKE CIRCULATION RENOVATION <br />Bid Item <br />Description <br />Quantity <br />Unit <br />Unit <br />Amount <br />No. <br />Note No. <br />Price <br />CONSTRUCT AND INSTALL <br />28 CN-26 <br />SKIMMER BOX AT LAKE EDGE AT <br />14 <br />EA <br />$2,000 <br />$28,000 <br />WALKWAY PER PLAN, AND <br />DETAIL 26 ON SHEET 14 <br />f <br />FURNISH AND INSTALL 6-INCH <br />29 CN-27 <br />SLOTTED INTAKE PER DETAILS <br />4 <br />EA <br />$4,000 <br />$16,000 <br />27A AND 27B ON SHEET 14 <br />FURNISH AND INSTALL 12-INCH <br />30 <br />CN-28 <br />EQUALIZER LINE PVC PIPE (C-900 <br />320 <br />LF <br />$38,400 <br />DR-25) PER PLAN, AND DETAIL 28 <br />$120 <br />SHEET 18, LENGTH PER PLAN <br />FURNISH AND INSTALL PUMP <br />31 <br />CN-36 <br />VAULT TYPE B WITH EQUIPMENT <br />I <br />EA <br />$186,000 <br />$186.000 <br />COMPLETE AS PER DETAILS ON <br />SHEET 18 <br />FURNISH AND INSTALL <br />32 CN-37 <br />WEIGHTED AIRLINE TUBING <br />2,550 <br />LF <br />$2 <br />$5,100 <br />FROM WALL TO AERATION POD <br />PER PLAN. <br />INSTALL WEIGHTED AIRLINE <br />33 <br />CN-38 <br />TUBING THROUGH PROPOSED <br />8 <br />EA <br />$400 <br />$3,200 <br />LAKE EDGE PER PLAN, AND <br />DETAIL 38 ON SHEET 18 <br />CONSTRUCT PIPE WALL <br />34 <br />CN-39 <br />PENETRATION THROUGH LAKE <br />42 <br />EA <br />$800 <br />$33,600 <br />EDGE PER PLAN, AND DETAILS <br />39A & 39B ON SHEET 13 <br />FURNISH AND INSTALL 3"-6" <br />35 CN-41 <br />RIVER ROCK PER PLAN, AND <br />40 <br />CY <br />$30 <br />$1,200 <br />TYPICAL SECTION 'R' HEREON. <br />FURNISH AND INSTALL 45-MIL <br />36 CN-42 <br />EPDM LINER PER PLAN, AND <br />222 <br />SY <br />$20 <br />$4,440 <br />TYPICAL SECTION'R' HEREON. <br />FURNISH AND INSTALL 1/4-TON <br />37 <br />CN-43 <br />RIP -RAP PROTECTION PER PLAN, <br />5 <br />CY <br />$400 <br />$2,000 <br />AND SECTION HEREON. <br />38 <br />CN-44 <br />CONSTRUCT FISH SPAWNING <br />31,600 <br />SF <br />$4 <br />$126,400 <br />AREA PER DETAIL 3 ON SHEET 10 <br />CONSTRUCT BIOFILTER PER <br />39 <br />CN-45 <br />PLAN AND DETAIL 12 ON SHEET <br />4 <br />EA <br />$60,000 <br />$240,000 <br />23 <br />CONSTRUCT 4" THICK CONCRETE <br />40 <br />CN-52 <br />PAVEMENT PER PLAN AND <br />5,100 <br />SF <br />$18 <br />$91,800 <br />COUNTY OF ORANGE OCPW STD <br />PLAN 1.621 <br />P-3 of P-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.