My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Centennial Lake Circulation Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 15 - Centennial Lake Circulation Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:48:29 AM
Creation date
8/10/2023 4:55:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />PROJECT TITLE: <br />Centennial Lake Circulation Renovation <br />PROJECT CATEGORY: <br />City Facility Improvements - <br />Park Facility Improvements <br />LOCATION MAP <br />W Hood Ave �n <br />W Edinger Ave <br />NabE4 <br />ec <br />c� <br />A <br />I* gal Regional Park <br />W Centenn <br />CITY OF SANTA ANA FY 22/23 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Design of a new circulation system on a 10 acre lake <br />at Centennial Park. <br />PROJECT NEED: <br />In 2017, the City retained a Consultant to analyze the <br />circulation system at Centennial Park Lake. The report <br />indicates only a portion of the current <br />circulation system is working and the lake needs a <br />complete new circulation system. Currently staff is <br />manually removing algae from the lake due to the <br />poor aeration system. The new system is estimated <br />to cost 2.2 million. Funding has been identified this year <br />to complete the design of the new system. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 1679 111 <br />TOTAL 3,679,135 <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />ARPA 3 6 <br />TOTAL 3,679,135 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Parks, Fleet & Facilities Suzi Furjanic, Assoc. Park Planner 28-Mar-2023 <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.