Laserfiche WebLink
November 2022 APP-22-045 <br />City of Santa Ana <br />Page 3 of 4 <br />CalAPP Attachment 01 <br />4. ADDITIONAL INFORMATION (if applicable) <br />NOTE:Only complete this section if you implement a platform other than SolarAPP+ <br />Please identify whether the following features are supported by the implemented <br />platform. All features are required for the platform to qualify for funding. CEC staff will <br />verify prior to payment approval. <br />Performs an automated plan review for residential solar energy <br />systems that completes automatic code compliance checks based <br />on user inputs (such as a contractor), thereby enabling or <br />otherwise issuing permits instantly when the project is confirmed <br />as code compliant, without the need for human review <br />Yes No <br />Supports online, immediate fee payment once an application is <br />complete, which may include auto-invoicing of permit fee costs Yes No <br />Supports immediate generation of a permit job card following <br />payment confirmation Yes No <br />Blocks noncompliant applications from receiving a permit Yes No <br />EITHER: 1) Stand-alone permitting tool; OR 2) Integrates with <br />current software and inspection platform already in use Yes No <br />5. REPORTING <br />Following adoption and verification of a qualifying platform, the <br />Energy Commission may request, and the Recipient will provide if <br />requested, annual data on the number of permits issued for solar <br />energy systems and a solar energy system paired with an energy <br />storage system including relevant characteristics of those systems, <br />such as system capacity. <br />Please indicate your acceptance of these terms. <br />Yes No