Laserfiche WebLink
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 13 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />April 4, 2023 <br />TOPIC: Easement to Southern California Edison <br />AGENDA TITLE <br />Grant an Easement to Southern California Edison to Allow Underground Power to Serve <br />Traffic Signal (Non -General Fund) <br />RECOMMENDED ACTION <br />Authorize the City Manager to execute an Easement Deed granting Southern California <br />Edison the right to own, place, and maintain power conduits and conductors underground <br />to serve APN 016-035-14. <br />DISCUSSION <br />In 2019, the City acquired a parcel of land located at 402 East Warner in conjunction with <br />the Warner Avenue Improvements project from Main Street to Oak Street. Along the east <br />side of the parcel exists a 17-foot wide Maple Street Bike Trail and Edison power pole <br />and overhead power lines serving the residential lots fronting Maple Street and a traffic <br />signal nearby (Exhibit 1). <br />As part of the Warner Avenue project, Edison will need to modify the power pole adjacent <br />to 402 East Warner to underground overhead facilities along Warner Avenue and provide <br />service for proposed traffic signal at Warner and Maple intersection. Therefore, non- <br />exclusive easement is needed for Edison to construct, use, maintain, operate, alter, add <br />to, repair, replace, reconstruct, and inspect the underground electrical supply system in <br />order to continue distributing electrical energy to the residents. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />EXHIBIT(S) <br />1. Easement Deed <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />