My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PFAS TREATMENT SYSTEMS <br />b. Final architectural details — coordinated with structural system details <br />c. Special construction details completed <br />d. Complete ceiling plan <br />e. Interior equipment <br />f. Room finished schedule including: <br />i. Color selection <br />H. Floor selection <br />iii. Wall finish <br />iv. Ceiling finish <br />g. Door schedule — including hardware; master key plan working with the City's <br />access control specialist <br />h. Window schedule including hardware <br />i. Architectural accessories schedule <br />j. Exterior finish and color schedule <br />III. Structural System <br />a. Complete set of structural drawings <br />b. Final structural details coordinated with architectural system details (if <br />applicable) <br />c. Permit set of stamped structural calculations <br />d. Final foundation and footing details <br />e. Final structural details including construction details <br />f. Final structural calculations <br />g. Performance requirements for shoring system identified <br />IV. Civil Site Plan System <br />a. Final estimate of fill and excavation quantities <br />b. Location of new utilities finalized <br />c. Utility connections finalized <br />d. Final design of water treatment facilities <br />e. Final channelization plans <br />f. Final signing plans <br />g. Final landscaping plans (if applicable including plant schedule) <br />h. Final irrigation system plans <br />i. Final erosion and sediment control plans <br />j. Final design of traffic mitigation <br />k. Permit set of stamped storm water management calculations <br />I. Surface Water Pollution Prevention Plans (SWPPS) when applicable <br />V. Mechanical System <br />a. Complete equipment schedule <br />b. Final piping plans <br />c. Final heating, ventilation and air conditioning (HVAC) plans <br />d. Final plumbing plans <br />e. Final fire protection plans and performance specifications <br />City of Santa Ana RFP 22-133 <br />On -Call Engineering Design Services for PFAS Treatment Systems <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.