My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Team Experience, <br />The following team members are available to start the assigned design packages immediately with the highest priority <br />and production. The leadership team we've selected are all local to the City. They are supported by design discipline <br />staff in our Irvine and Pasadena offices. We have the flexibility and deep bench or subject matter resources to create <br />additional functional teams through our design centers. Please see the Appendices for resumes and percentage of time <br />our staff will be devoted to your project. <br />Technical Review <br />✓ Jim Borchardt, PE <br />Ken Martins, PE <br />Project Engineer: Planning Study <br />✓ Tyler Hadacek, PE* <br />Survey <br />✓ Greg Sebourn, PLS, <br />MASCE <br />Site Civil <br />✓ Nahid Heidarbaghi, PE, <br />LEEDAP <br />Mechanical <br />✓✓ Sean Neprud, PE, <br />LEEDAP <br />I <br />Project Manager/Principal Agent <br />✓ Jim Cathcart, PE, F. ASCE <br />Geotechnical <br />✓ Leighton Consulting <br />Structural <br />✓ Simon Lin, Ph.D., PE, SE <br />Electrical <br />✓✓ Bruce Wong, PE, PMP, <br />ENV SP <br />Instrumentation and Controls <br />✓ Nadarajan "Sanki" <br />Sankaran, PE <br />Project Engineer: Design -Bid a} d Construction <br />✓ Cole Warrick, PE* <br />Cost Estimating <br />Jim Loucks, PMP, CCP <br />Treatment/Process <br />Mechanical <br />✓✓ Tyler Hadacek, PE <br />✓ Ryan Capelle, PE <br />Hydraulics <br />✓ Tori Klug, PE <br />System Integration <br />✓ Enterprise Automation <br />Engineering Services <br />During Construction <br />✓ Cole Warrick, PE <br />✓ Dan Heston <br />✓ Local <br />Recent PFAS Experience <br />*In charge (if project manager/principal agent is unavailable) <br />Meet Your <br />Project Decades of water Well head Groundwater ASCE <br />4 system planning equipping Treatment <br />Manager and facility design designs Projects Fellow <br />Jim Cathcart <br />Our local, multidiscipline team will be lead by Senior Principal Jim Cathcart, PE, <br />F.ASCE. Jim has decades of experience managing multimillion -dollar projects <br />with diverse project teams for both <br />traditional and design -build projects. He <br />Stantec Design Centers <br />demonstrates the portfolio and program <br />Our design centers bring together a <br />management skills necessary for your <br />diverse group of civil, electrical, HVAC and <br />projects. Jim also champions new ideas <br />plumbing, instrumentation and control <br />and initiatives that create environments <br />(I&C), process mechanical and structural <br />to support implementation of innovation. <br />engineers, as well as registered architects <br />He brings vast expertise in leading our <br />and CAD designers and technicians to meet <br />design Center team of subject matter <br />critical schedules. <br />experts and subconsultant firms. <br />City of Santa Ana I On -Call Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.