My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Purchase and Installation of Synthetic Turf at the Dan Young Sports Complex
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Item 12 - Purchase and Installation of Synthetic Turf at the Dan Young Sports Complex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 8:38:08 AM
Creation date
8/11/2023 8:37:45 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
3/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />COOP PRICING PROPOSAL <br />12 A 10-year 3rd party pre-paid insured warranty on the <br />FieldTurf artificial grass surface 1 LS INCLUDED INCLUDED <br />13 Taxes 1 LS $63,792.00 $63,792.00 <br /> <br /> Subtotal Synthetic Turf $1,136,968.42 <br /> <br />14 Performance & Payment Bonds 1 LS $33,035.29 $33,035.29 <br />15 Design fee 1 LS $32,000.00 $32,000.00 <br /> <br /> Dan Young Sports Complex TOTAL $2,675,858.79 <br /> <br /> <br />PRODUCT DETAILS <br /> <br />FieldTurf, the worldwide leader in artificial turf, is pleased to offer the FieldTurf Vertex Prime with Core <br />and CoolPlay (FTVTC-1-CP), with the following product characteristics: <br /> <br />VERTEX PRIME CORE WITH COOLPLAY <br /> Pile Height: 2.5 Inches <br /> Infill Weight: 6.2lbs sand, 2.4lbs Cryogenic Rubber & 0.6lbs CoolPlay per sq.ft. <br /> Pile Weight: 47 oz/yd2 <br /> Total System Weight: 1393 oz/yd2 <br /> <br />FieldTurf has taken the necessary steps to ensure that your project will run smoothly and that the quality <br />promised will be the quality delivered. <br /> <br />CIVIL SCOPE INCLUDES: <br /> <br />Pricing is based upon Fieldturf plans dated 01/27/23. Pricing includes: <br /> <br />a) General conditions to include equipment mobilizations, construction staking, temporary <br />bathrooms as needed, rumble plates at field entrance, onsite supervision, erosion control BMPs. <br />b) Demolition onsite per plansheet L-3 & L-4 to include goalposts, storm drain line and catch basin <br />as noted, capping of irrigation, removing of irrigation laterals as needed, demo asphalt paving. <br />c) Earthwork to include removal of existing sod (assumed 3”), cut/fill site to balance site, finish grade <br />subgrade of field. <br />d) Drainage per plansheet L-7 & L-8 to include perforated collectors (6” & 8”) per plans, nyloplast <br />basins, connection to existing storm drain outlet pipe, 1”x12” flat tile. <br />e) Synthetic turf base to include soil separation fabric, composite nailer board at perimeter for turf <br />attachment, Furnish & install 6” permeable base course, fine grade fields to within Fieldturf <br />tolerances. <br />Exhibit 3
The URL can be used to link to this page
Your browser does not support the video tag.