Laserfiche WebLink
ADDENDUM NO. -I <br />CITY OF SAN'TA A NA <br />PROPOSAL <br />PROJECT NO.: 22-6622 <br />DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION <br />Item <br />Description <br />Qty <br />Unit <br />unit Price <br />Amount <br />55 <br />a Gallon Shrub (Fumisli Material Only)** <br />7 <br />EA <br />S 35.00 <br />S 245,00 <br />56 <br />15 Gallon Shrub (Furnish Material <br />2 <br />EA <br />$ 110.00 <br />S 220.00 <br />Only)*" <br />57 <br />15 Gallon Tree Including7ree Staking and <br />2 <br />EA <br />$ <br />S <br />Protection <br />250.00 <br />500.00 <br />58 <br />Rcmove, Temporarily Box, and Reinstall <br />3 <br />EA <br />$ <br />S <br />Palm Tree <br />7,500.00 <br />22,500.00 <br />39 <br />❑CCC Planting"* <br />! <br />LS <br />$2,146 <br />S2,146 <br />60 <br />install 2.5" Deep Decomposed Granite <br />1,780 <br />SF <br />$ <br />S <br />Mulch ('California Gold') or Match <br />5.00 <br />8,9C0.00 <br />Existing <br />61 <br />Install 4" Deep Decomposed Granite Path <br />95 <br />SF <br />$ 0 00 <br />5 950.00 <br />('California Gold'j or Match Existing <br />62 <br />Soil Conditioning & Topsail Placement <br />1,730 <br />SF <br />$ 3.00 <br />$ <br />5,340.00 <br />63 <br />F: rtilixerTablets 21 Gram <br />1 <br />LS <br />S 250.00 <br />$ 250.00 <br />64 <br />Non -woven Geotextile Fabric Including <br />1,780 <br />SF <br />$ 2.85 <br />S 5,073.00 <br />Pins <br />65 <br />Relocate Landscape Boulder <br />? <br />EA <br />S 300 00 <br />S 6a0 as <br />66 <br />Install 3'x3'x3' Landscape Boulder <br />5 <br />EA <br />$ 400.00 <br />S <br />2,000.170 <br />67 <br />Install 2'x2'x2' Landscape Boulder <br />4 <br />EA <br />$ <br />350.00 <br />S <br />1,400.00 <br />68 <br />Plant Establishment (90 Days) <br />1 <br />LS <br />$ 3,500.00 <br />S 3,500.00 <br />69 <br />Protection and Modification of Drip <br />1 <br />LS <br />$ <br />1$,000.00 <br />S <br />18.000.00 <br />Tubing Irrigation System <br />Bid Alternates <br />1 <br />Remove and Replace 8" Thick Colored <br />1,07D <br />SF <br />$ 40.00 <br />$ 42,800.00 <br />Concrete Pavement in Vinci <br />Adjust Water Valve Frame and Cover to <br />13 <br />EA <br />$ 1,000.00 <br />$ 13.000.00 <br />Grade <br />3 <br />Adjust Sanitary Sewer Maintenance Role <br />2 <br />EA <br />$ 1,000.00 <br />$ 2,400.00 <br />Frame and Caper to Grade <br />4 <br />2"' Cold Mill <br />4,200 <br />SY <br />$ <br />5.00 <br />$ <br />21,000.00 <br />5 <br />2" AIMM Overlay <br />473 <br />'TOWS <br />S <br />200.00 <br />$ <br />94,600.oa <br />G <br />Signing, and Striping <br />I <br />LS <br />S 25,000.oa <br />S 25.000.00 <br />I Rep1;lc:cs Bit] lwni 501 <br />Bid Ilem -50 (subtravl) <br />A 5,�1nn O0�7lJ.00 <br />P-4 of P-19 <br />