Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 22-6622: DOWNTOWN FLOOD REDUCTION <br />AND STORMWATER INFILTRATION PROJECT <br />Construction Contract <br />$4,642,644 <br />Contract Administration, Inspection and Testing <br />$552,356 <br />Contingencies <br />$445,000 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$5,640,000 <br />