10
<br />PROPOSAL FOR
<br />On -Call Environmental Services
<br />RFP NO.: 21-105
<br />tracked timelines. She has prepared and managed CEQA/NEPA documents including Initial Studies (ISs),
<br />Mitigated Negative Declarations (MNDs), Environmental Impact Reports (EIRs), Environmental Assessments
<br />(EAs), and Environmental Impact Statements (EISs), for projects throughout California on behalf of federal,
<br />state, regional, and local agencies and private clients. Her expertise also includes data collection and analysis
<br />on environmental issues such as visual resources, land use, public services, biological resources,
<br />socioeconomics, recreation, and utilities.
<br />REPRESENTATIVE PROJECT EXPERIENCE:
<br />• Well 32 IS/MND Rehabilitation and Pipeline Project, Santa Ana, CA
<br />• Well 12, Well 14, and Pipeline Project IS/MND, Santa Ana, CA
<br />• Washington Avenue Well Project IS/MND, Santa Ana, CA
<br />• First Street Stabilization Project Categorical Exemption (CATEX), Santa Ana, CA
<br />• Water Well No. 39 Hydro -generator Unit Replacement Project CATEX, Santa Ana, CA
<br />• Moulton Niguel Water District Crown Valley Pipeline Replacements Project, Laguna Niguel, CA
<br />• Central Park Amphitheater Project IS/MND, Rancho Cucamonga, CA
<br />• Central Park Program EIR, Rancho Cucamonga, CA
<br />• Adventure Park Multi -Benefit Stormwater Capture Project Addendum to PEIR, Whittier, CA
<br />• Santa Ana River Interceptor Line Project, Supplemental EA and EIR Addendum, Orange County, CA
<br />• City of Huntington Beach, Water Well Project IS, Westminster, CA
<br />LICENSES, REGISTRATIONS, &
<br />CERTIFICATES:
<br />EDUCATIONAL BACKGROUND:
<br />PhD Geomorphology, Johns
<br />POSITION WITH TETRA TECH:
<br />Senior Project Manager
<br />MSHA 24-Hour trained, 2017
<br />MSHA 8-Hour Refresher, 2018
<br />Hopkins University
<br />BA Physical Geography,
<br />PROJECT ROLE:
<br />Environmental Services,
<br />University of California,
<br />Geological/Soil Study,
<br />Berkeley
<br />Mineral Resource Study,
<br />Hydrology/Water Quality Study
<br />EXPERIENCE:
<br />Dr. Coleman is a Senior Project Manager who has over 30 years of experience in environmental consulting,
<br />primarily focused on water resource evaluations and NEPA/CEQA assessments. He has managed
<br />preparation of numerous environmental document projects for commercial -scale alternative energy projects,
<br />as well as contributed to assessment documents as a technical lead for geology and soils, and/or water
<br />resources. Dr. Coleman's technical specialization is in geomorphology and hydrology. He has applied his
<br />expertise in fluvial geomorphology to erosion and sedimentation analyses, flood plain delineation and
<br />evaluation, wetlands delineation (the surface water -groundwater interface), and archaeological
<br />geomorphology. His hydrology experience includes engineering design of surface drainage systems,
<br />environmental contaminant evaluation (primarily soils and groundwater), environmental impact assessments,
<br />and underground storage tank investigations.
<br />REPRESENTATIVE PROJECT EXPERIENCE:
<br />• Well 32 IS/MND Rehabilitation and Pipeline Project, Santa Ana, CA
<br />• Well 12, Well 14, and Pipeline Project IS/MND, Santa Ana, CA
<br />• Washington Avenue Well Project IS/MND, Santa Ana, CA
<br />• First Street Stabilization Project CATEX, Santa Ana, CA
<br />• Water Well No. 39 Hydro -generator Unit Replacement Project CATEX, Santa Ana, CA
<br />• Moulton Niguel Water District Crown Valley Pipeline Replacements Project, Laguna Niguel, CA
<br />• Central Park Amphitheater Project IS/MND, Rancho Cucamonga, CA
<br />• Central Park Program EIR, Rancho Cucamonga, CA
<br />• Santa Ana River Interceptor Line Project, Supplemental EA and EIR Addendum, Orange County, CA
<br />• City of Huntington Beach, Water Well Project IS, Westminster, CA
<br />City of Santa Ana 4 TETRA TECH
<br />
|