My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Amend CIP for the West Willits Protected Bike Lanes from Fairview Street to Raitt Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 10 - Amend CIP for the West Willits Protected Bike Lanes from Fairview Street to Raitt Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:58:53 AM
Creation date
8/11/2023 9:27:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
10
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract to Excel Paving Co. <br />March 7, 2023 <br />Page 3 <br />Contingencies J $208,200.00 <br />TOTAL CONSTRUCTION DELIVERY COST 11 $2,277,000.00 <br />The construction funding for this project was approved by Council in the 19/20 CIP <br />(Exhibit 5). It has subsequently been carried forward to be available in Fiscal Year <br />Ending 2023. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2019-32 was filed for the project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $2,277,000.00, which includes construction, contract administration, <br />inspection, testing, and an authorized contingency. Project No. 19-6948 is the number <br />assigned to the Project Plans and Specifications and the Notice Inviting Bids. Project <br />No. 19-6948 is the number assigned to the funding for tracking of all expenditures to <br />deliver the construction of this project. <br />The following table summarizes the funds budgeted and available in current FY 2022-23 <br />for expenditure to deliver construction of this project. Any remaining balances not <br />expended at the end of the fiscal year will be presented to City Council for approval of <br />carryovers to FY 2023-24. <br />Accounting <br />Accounting Unit - <br />Fiscal <br />Unit - Account <br />Fund <br />Account No. <br />Amount <br />Year <br />No. <br />Description <br />Description <br />Project No. <br />ExistingProject Budget Exc uding Design Engineering) <br />Traffic System <br />Active <br />14817615- <br />Management <br />Transportation <br />2022-23 <br />66220 <br />Grant - ATP- <br />Program <br />$2,277,000.00 <br />(19-6948) <br />S131 <br />Augmentation — <br />Augmentation <br />Improvements Other <br />Than Buildings <br />Total <br />$2,277,000.00 <br />EXHIBIT(S) <br />1. Location Map <br />2. Bid Proposal <br />3. Construction Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.