Laserfiche WebLink
EXHIBIT 'B" <br />10/18/22, 8:40 AM <br />SAM.gov <br />GROUP <br />1.....................$ 48.50 <br />21.37 <br />R E B I D <br />GROUP <br />2.....................$ 47.55 <br />21.37 <br />GROUP <br />3.....................$ 44.01 <br />21.37 <br />FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a <br />Bosn'n's Chair or suspended from a rope or cable shall <br />receive 40 cents per hour above the foregoing applicable <br />classification rates. Workers doing gunite and/or <br />shotcrete work in a tunnel shall receive 35 cents per hour <br />above the foregoing applicable classification rates, paid <br />on a portal-to-portal basis. Any work performed on, in or <br />above any smoke stack, silo, storage elevator or similar <br />type of structure, when such structure is in excess of <br />75'-0"" above base level and which work must be performed in <br />whole or in part more than 75'-0"" above base level, that <br />work performed above the 75'-0"" level shall be compensated <br />for at 35 cents per hour above the applicable <br />classification wage rate. <br />GUNITE LABORER CLASSIFICATIONS <br />GROUP 1: Rodmen, Nozzlemen <br />GROUP 2: Gunmen <br />GROUP 3: Reboundmen <br />LAB00652-001 07/01/2022 <br />Rates <br />Fringes <br />LABORER (TUNNEL) <br />GROUP <br />1.....................$ <br />45.68 <br />23.30 <br />GROUP <br />2.....................$ <br />46.00 <br />23.30 <br />GROUP <br />3.....................$ <br />46.46 <br />23.30 <br />GROUP <br />4.....................$ <br />47.15 <br />23.30 <br />LABORER <br />GROUP <br />1.....................$ <br />36.39 <br />21.04 <br />GROUP <br />2.....................$ <br />36.94 <br />21.04 <br />GROUP <br />3.....................$ <br />37.49 <br />21.04 <br />GROUP <br />4.....................$ <br />39.04 <br />21.04 <br />GROUP <br />5.....................$ <br />39.39 <br />21.04 <br />LABORER CLASSIFICATIONS <br />GROUP 1: Cleaning and handling of panel forms; Concrete <br />screeding for rough strike -off; Concrete, water curing; <br />Demolition laborer, the cleaning of brick if performed by a <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and/or <br />water pipeline laborer; Laborer, asphalt -rubber material <br />loader; Laborer, general or construction; Laborer, general <br />clean-up; Laborer, landscaping; Laborer, jetting; Laborer, <br />temporary water and air lines; Material hose operator <br />(walls, slabs, floors and decks); Plugging, filling of shee <br />bolt holes; Dry packing of concrete; Railroad maintenance, <br />repair track person and road beds; Streetcar and railroad <br />construction track laborers; Rigging and signaling; Scaler; <br />Slip form raiser; Tar and mortar; Tool crib or tool house <br />laborer; Traffic control by any method; Window cleaner; <br />Wire mesh pulling - all concrete pouring operations <br />GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger <br />https:/Isam.govtwage-determination/CA20220024/15 16/25 <br />