My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Construction Contract for Bristol Street and Santa Clara Avenue Traffic Signal Modification
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 12 - Construction Contract for Bristol Street and Santa Clara Avenue Traffic Signal Modification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 12:01:05 PM
Creation date
8/11/2023 9:28:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol Street and Santa Clara Avenue <br />Signal Modification <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP /� 1 <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Install left turn phasing for north and south directions on Bristol Street at <br />Santa Clara Avenue. <br />PROJECT NEED: <br />This project designed to enhanced intersection traffic safety. <br />3ROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25126 FY 26/27 FY 27/28 FY 28/29 <br />617,000 <br />TOTAL 617,100 <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24125 FY 25126 FY 26/27 FY 27/28 FY 28/29 <br />GENERAL FUND 320,000 <br />ATP FEDERAL 297,100 - - - - - - <br />TOTAL 617,100 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Traffic Engineering Zdenek Kekula, Principal Civil Engineer 08-Feb-2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.