My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Construction Contract for Bristol Street and Santa Clara Avenue Traffic Signal Modification
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 12 - Construction Contract for Bristol Street and Santa Clara Avenue Traffic Signal Modification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 12:01:05 PM
Creation date
8/11/2023 9:28:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6995 <br />BRISTOL ST AND SANTA CLARA AVE TRAFFIC SIGNAL MODIFICATION <br />FEDERAL PROJECT NO.: HSIPL 5063(204) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Modification <br />1 <br />LS <br />$ <br />$ <br />ZG31000 <br />2 <br />Install Video Detection System at <br />Bristol St Santa Clara Ave <br />1 <br />LS <br />$ <br />y2,300 <br />$ <br />4ZI300 <br />and <br />3 <br />* Install 2" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />'7� <br />7.000 <br />4 <br />* Install 3" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />100 <br />10,000 <br />5 <br />* Install 4" PVC Conduit per Plan <br />500 <br />LF <br />S <br />S <br />41),000 <br />6 <br />* Install No. 6 Pull Box <br />6 <br />EA <br />$I,ZOrJ <br />112,30 <br />7 <br />* Install No. 6E Pull Box <br />2 <br />EA <br />1 5$5 <br />$� 110 <br />' <br />8 <br />* Remove and Replace Concrete <br />100 <br />SF <br />$ <br />$ <br />Sidewalk <br />(nq . 50 <br />(oq 50 <br />9 <br />Cold Mill (2") <br />5900 <br />SF <br />$ <br />$ <br />2 •-15 <br />16,Z7-S <br />10 <br />Asphalt Rubber Hot Mix (ARHM) <br />74 <br />TN <br />$ <br />$sz ?ro <br />703•24 <br />11 <br />Temporary Overhead Wiring at <br />1 <br />LS <br />$ <br />$ <br />Bristol St and Santa Clara Ave <br />t(o' Sb0 <br />1(0, S00 <br />12 <br />Pothole Pole Locations for Utility <br />Conflicts <br />8 <br />EA <br />$ �� <br />$�' g� <br />13 <br />Pothole Utility Not Shown on Plans <br />4 <br />EA <br />$Q SO <br />400 <br />P-1 of P-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.