My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Project Backboard Renovation of the Basketball Court at Portola Park
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 14 - Project Backboard Renovation of the Basketball Court at Portola Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 12:01:35 PM
Creation date
8/11/2023 9:30:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Backboard <br />c/o Dan Peterson <br />53 Christamon S. <br />Irvine CA, 92620 <br />dpeterson@projectbackboard.org <br />(512) 492 2062 <br />Description <br />This Scope of Work is for the repair and resurfacing of one basketball court at <br />Portola Park, 1700 E Santa Clara Ave, Santa Ana, CA 92705. <br />Project Backboard to provide the following: <br />• Clean existing basketball court. <br />• Patch and level significant "bird bath" areas and repair existing <br />cracks <br />• Apply acrylic sports resurfacer (Sport Master or similar brand) <br />• Two (2) coats, minimum, of acrylic sports specific color coating <br />(Sport Master or similar brand) in accordance with the requirements <br />of final approved design. <br />• Source all stencils and other materials needed to install court <br />a rtwo rk. <br />• Stripe court(s) with textured acrylic with line paint. <br />• Remove and replace basketball rims. <br />• Clean and repaint existing basketball backboards as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.