My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Pool Maintenance Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
02/21/2023 Regular
>
Item 16 - Pool Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 9:41:31 AM
Creation date
8/11/2023 9:41:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 16 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br />February 21, 2023 <br />TOPIC: Pool Maintenance Services <br />AGENDA TITLE: <br />Approve an Agreement with Service 1st for Pool Maintenance Services at Five City <br />Pools for a Three-Year Term for an Annual Amount not to Exceed $248,135, Including <br />an Annual Contingency of $50,000, for a Total Agreement Amount of $1,240,675 <br />(General Fund) <br />RECOMMENDED ACTION <br />Authorize the City Manager to execute an agreement with Service 1st to provide <br />scheduled maintenance duties in an annual amount of $248,135, including an annual <br />contingency of $50,000, for a total agreement amount not to exceed $1,240,675 for a <br />three-year period beginning February 21, 2023 and ending on February 20, 2026, with <br />an option for two, one-year extensions, subject to non-substantive changes approved by <br />the City Manager and City Attorney. <br />DISCUSSION <br />The Public Works Agency (PWA) is in need of a qualified contractor to provide an <br />exceptional quality of service for pool maintenance and repairs at five city pools. The <br />pools are El Salvador Pool, Jerome Pool, Memorial Pool, Salgado Pool (located at <br />Rosita Park), and Santa Anita Pool. The Parks General Maintenance section is <br />responsible for maintaining the City’s aquatic centers and water features. Due to heavy <br />use of the aquatic facilities and deferred preventive maintenance over the last several <br />years, the facilities are in constant need of equipment repairs and replacement. After <br />evaluating the status of all city pools, in collaboration with the Parks and Recreation <br />staff, PWA determined the need of a contractor to address routine equipment <br />maintenance, water treatment, and emergency repairs. Specialized knowledge and <br />professional upkeep are essential for safe and sanitary conditions for our swimming <br />pools. <br />On November 30, 2022, PWA issued Request for Proposals (RFP) No. 22-167 by which <br />it sought the services of qualified contractors to provide continuous pool maintenance to <br />preserve five city pools. The RFP was advertised on the City’s online bid management <br />and publication system, with bids due on December 14, 2022. Three proposals were
The URL can be used to link to this page
Your browser does not support the video tag.