My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Pool Maintenance Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
02/21/2023 Regular
>
Item 16 - Pool Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 9:41:31 AM
Creation date
8/11/2023 9:41:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E,XHIBIT A <br />Appendix <br />ATTACHMENT 1: SCOPE OF WORK <br />SCOPE OF WORK <br />l. General <br />The basic service obligations of the contractor shall include, but not be limited to, the <br />following: <br />. Vacuum pool <br />. Clean pool tiles, pump strainers, and basket strainers <br />. Brush poolplaster <br />. Clean back-wash filters <br />' Test pool water chemistry (i.e. chlorino, pH, alkalinity, calcium hardness, etc.) <br />. Maintain water levels (i.e. fill andlor drain) <br />. Pool start up <br />. Chemical treatrnent <br />. Clean pool deck and pump room <br />. Pool eqr"ripment inspection <br />. Testing/replacement of pool lamps <br />2. Locations <br />PARK/POOL SITE ADDRESS SIZE (in gallons) <br />El Salvador Park <br />. El Salvador Pool <br />1825 W. Civic CenterDrive <br />Santa Ana, CA92703 <br />99,000 <br />Jerome Park <br />o Jerome Pool <br />726 S. Center Street <br />Santa Ana, CA92704 <br />249,907 <br />Memorial Parko Memorial Pool <br />2102 S. Flower Street <br />SantaAna, CA92707 <br />600,000 <br />Rosita Parkr Salgado Pool <br />706 N. Newhope Street <br />Santa Ana, CA92703 <br />88,594 <br />Santa Anita Parko Santa Anita Pool <br />300 S. Figueroa Street <br />Santa Ana, CA92704 <br />103,500 <br />Hours of Operation <br />'The Contractor shall accomplish all maintenance required under this RFP before 3:00 p.m. <br />During the swim season (May I - September 15) maintenance shall be reqr,rired five days a week <br />(Monday through Friday) for all pools. Dr"rring the off season (September 16 - April 30) <br />maintenance shall be required three days a week (Monday, Wednesday and Friday) for all pools. <br />J.
The URL can be used to link to this page
Your browser does not support the video tag.