Laserfiche WebLink
<br /> Hazard Mitigation Plan | 2022 <br />Mitigation Strategies <br />- 120 - <br /> Mitigation Action Item Lead Department Timeline Goal: Protect Life and Property Goal: Public Awareness Goal: Natural Systems Goal: Emergency Services Goal: Partnerships and Implementation Buildings & Infrastructure: Does the Action item involve New and/or Existing Buildings and/or Infrastructure? Yes (Y), No (N) Funding Source and Planning Mechanism: B – Budget, CIP – Capital Improvement Program, , HMGP- Hazard Mitigation Grant Program, BRIC – Building Resilient Infrastructure and Communities Grant, EMPG – Emergency Management Planning Grant Benefit: L-Low, M-Medium, H-High Cost: L-Low, M-Medium, H-High Priority: L-Low, M-Medium, H-High 8. Santa Fe Grand subarea 3 improvements <br />9. Wintersburg subarea 15 improvements <br />10. Santa Fe subarea 1 (2 of 2) <br />improvements <br />FLD-15 Redesign or reengineer sewer lift <br />stations to prevent flooding inside stations. If <br />flooding occurs, limited ability to pump <br />sewage. <br />Water Resources <br />Division 5 years X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />M H M <br />Epidemic / Pandemic / Vector-Borne Disease <br />Mitigation Action Items <br />EPV- 1 Partner with County of Orange Vector <br />Control to develop and maintain a public <br />information campaign to educate residents <br />and businesses on vector-borne hazards and <br />mitigation measures. <br />Public Works Ongoing X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />M H M <br />EPV-Continue to work with County of Orange <br />Vector Control for mosquito abatement <br />projects aimed at protecting the City. <br />Public Works Ongoing X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />M H M <br />