Laserfiche WebLink
<br /> Hazard Mitigation Plan | 2022 <br />Attachments <br />- 133 - <br /> <br />Q&A | ELEMENT A: PLANNING PROCESS | A1a. <br />Q: Does the plan document the planning process, including how it was prepared (with a narrative <br />description, meeting minutes, sign-in sheets, or another method)? (Requirement §201.6(c)(1)) <br />A: See Web Postings of Second Draft Plan below. <br />Q&A | ELEMENT A: PLANNING PROCESS | A3a. <br />Q: Does the plan document how the public was given the opportunity to be involved in the planning <br />process? (Requirement §201.6(b)(1)) <br />A: See Web Postings of Second Draft Plan below. <br /> <br />Web Postings of Second Draft Plan <br />City of Santa Ana Website <br /> <br /> <br /> <br />