My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Appropriate Additional Construction Funding
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 14 - Appropriate Additional Construction Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 3:52:23 PM
Creation date
8/11/2023 3:52:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The project entails constructing median protected bike lane on <br />portions of Sant Ana Blvd, 5th, 6th, Brown, Lacy, Garfield, and <br />Mortimer between the Santa Ana Regional Transportation Center <br />(SARTC) and Orange County Civic Center. <br />PROJECT NEED: <br />City of Santa Ana is developing safer, walkable streets for Santa Ana <br />residents who are dependent on walking or bicycling for transportation <br />every day. Implementation of these types of street improvements are <br />the result of goals established by the City' s Active Transportation Plan <br />ATP) and ultimately provides safe bicycling and walking in the City, <br />enhances non -motorized travel infrastructure, and creates options to <br />support the existing population. <br />PROJECT TITLE: <br />Santa Ana Boulevard and 5th Street <br />Protected Bike Lane <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 04-Nov-2022 <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 850,000 ------ <br />TOTAL 850,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />CMAQ 400,000 ------ <br />GAS TAX 450,000 ------ <br />TOTAL 850,000 ------
The URL can be used to link to this page
Your browser does not support the video tag.