My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Amend Agreements for Renewable Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 16 - Amend Agreements for Renewable Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 3:53:07 PM
Creation date
8/11/2023 3:52:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />07/07/2022 - Proposal No: Q-00390 Quote Valid until: 12/31/2022 <br />Opal Fuels - 10225 Philadelphia Court, Rancho Cucamonga, 91730 | 909-793-3700 | (fax) 909-793-8056 | www.opalfuels.com <br /> <br /> <br />Opal Fuels is pleased to offer the following proposal for a time fill/fast fill station at the following location: <br /> <br />City of Santa Ana <br />215 South Center Street <br />Santa Ana, CA <br />92703 <br /> <br />This 100% turnkey proposal addresses the following requirements: <br />- Design, Planning, Permitting, Equipment, Construction, Start Up and Training <br /> <br />This proposal includes (2) 200 HP Compressors, 60,290 scf (476 GGE) High Pressure Storage, <br />Defuel Hose, 40 time-fill hoses (10 wall mounted, 30 Caisson Mounted) and 1 Dual Hose Fast- <br />Fill Island with Card Reader. <br /> <br />Use the table below to determine the production capability of this proposal <br />COMPRESSOR PERFORMANCE CAPACITY [1 DGE = 135 cubic feet / 1 GGE = 123.57 cubic feet] <br /> <br />Compressor <br />Per Min. <br />Production <br />GGE <br />Per Min. <br />Production <br />DGE <br />Per Hr. <br />Production <br />GGE <br />Per Hr. <br />Production <br />DGE <br />Per 6 Hr. <br />Production <br />GGE <br />Per 6 Hr. <br />Production <br />DGE <br />Per 12 Hr. <br />Production <br />GGE <br />Per 12 Hr. <br />Production <br />DGE <br />1 3.59 3.29 215.40 197.40 1292.40 1184.40 2584.80 2368.80 <br />2 7.18 6.58 430.80 394.80 2584.80 2368.80 5169.60 4737.60 <br /> <br />The Time-Fill Station as quoted has the following dispensing capabilities. <br />Equipment: <br />• Time fill 40 vehicles with 35 GGE in: 3.25 hours with 2 compressors <br />• Time fill 40 vehicles with 35 GGE in: 6.50 hours with 1 compressors <br /> <br />The Fast-Fill Station as quoted has the following dispensing capabilities. <br />Equipment: <br />• Qty of Dispenser Cabinets: 1 <br />• Qty of Standard Flow Hoses: 1 <br />• Qty of Commercial High-Flow Hoses: 1 <br /> <br /> <br /> <br /> <br />The compression scenario is based off an inlet pressure of 30 PSIG with adequate flow. Lower pressures will <br />affect the production by lowering the per minute/hour production.
The URL can be used to link to this page
Your browser does not support the video tag.