My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Amend Agreements for Renewable Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 16 - Amend Agreements for Renewable Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 3:53:07 PM
Creation date
8/11/2023 3:52:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />07/07/2022 - Proposal No: Q-00390 Quote Valid until: 12/31/2022 <br />Opal Fuels - 10225 Philadelphia Court, Rancho Cucamonga, 91730 | 909-793-3700 | (fax) 909-793-8056 | www.opalfuels.com <br />TIME FILL/FAST FILL STATION EQUIPMENT OVERVIEW <br /> <br />DESIGN AND ENGINEERING (to be performed by Opal Fuels) <br />Opal Fuels will initially meet to understand the requirements of your proposed station. At Opal Fuels's discretion <br />Opal Fuels will provide exhibit drawings. The design will be based off the conceptual layout for the location. <br />Upon signed agreement and 20% down payment, a final design will include PE-stamped CAD drawings for <br />each phase of the project, including but not limited to: electrical, mechanical and civil for permitting purposes. <br />Opal Fuels will acquire all permits necessary for complete build in all phases of construction. <br /> <br />Design and construction will consider industry standards and all executable local, State, and/or Federal <br />building codes as interpreted by the Fire Marshall and/or building inspector with regional jurisdiction. <br /> <br />PROJECT MANAGEMENT <br />A dedicated project manager is assigned to each project for the duration of the project. The assigned project <br />manager is involved with the project from the design phase throughout the construction and startup. The <br />project manager will be 100% responsible for all of the daily activity at the job site and will report construction <br />progress to the customer's designated contact on a weekly basis. This project manager is responsible to ensure <br />that all Opal Fuels employees and subcontractors follow Opal Fuels and Customer safety and site policies. The <br />project management fee includes site equipment mobilization, Opal Fuels employee travel & lodging and <br />project management. <br /> <br />START UP LABOR <br />Includes certified equipment technician on site for four days, on site operations and maintenance training and <br />one site follow-up visit by technician in first six months after start up. <br /> <br />UTILITY EXTENSIONS REQUIRED BY CUSTOMER <br />• A single High Speed Broadband Internet (RJ45) connection for CP-400 Communication (3MB minimum - <br />7MB optimal) package is required at the compressor staging area. <br />• A second phone line is required for customers using a gas broker for a telemetric meter. <br />• A third High Speed Broadband Internet (RJ45) connection (3MB minimum - 7MB optimal) is required for <br />customers using a credit card reader for public fuel dispensing or private fleet information collection. <br />Electrical Service <br />• A 800 amp electrical service is required at the compressor staging area from your Electric Utility provider <br />- 277/480, 3 phase 4-wire service. <br />Natural Gas Service <br />• 30 psi pressure capable of delivering 53280 cubic feet of natural gas per hour, with the gas meter <br />located at the compressor staging area. Note: (lower pressures can be acceptable for the production <br />of CNG at the designated site location. Lower pressures will drop the hourly production rate of CNG). <br />The customer is responsible to provide all electrical, phone and gas service as required within 25 feet of the <br />compressor compound and responsible for all associated costs. Opal Fuels will work with your local utilities to <br />validate existing service and determine what necessary upgrades are required to satisfy utilities requirements.
The URL can be used to link to this page
Your browser does not support the video tag.