Laserfiche WebLink
CITY OF SANTA ANA <br />ADVERTISEMENT ADDENDUM NO. ONE <br />PROJECT NO.: 19-6951 <br />SAFE ROUTES TO SCHOOL <br />DAVIS ELEMENTARY ACCESS COMPLIANCE <br />NOTICE INVITING BIDS <br />NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive Bids electronically via <br />PlanetBids on or before 2:00 pm, October 5, 2022. No late bids will be accepted. No other method <br />of bid submittal will be accepted for: <br />PROJECT NO.: 19-6951, ATPSB 1 L-5063(193) <br />SAFE ROUTES TO SCHOOL DAVIS ELEMENTARY ACCESS COMPLIANCE <br />All Plans and Specifications are available on PlanetBids. <br />For further information on how to register as a vendor refer to: <br />htikis://www.santa-ana.org/vendor-registration/ <br />Do not call Purchasing Division regarding Public Works Agency projects. <br />Scope of Work: Installation of bulb -outs at crossings adjacent to Davis Elementary School, <br />reconstruction and installation of ADA compliant curb ramps, sections of sidewalks, curb and <br />gutter, removal, water quality BMPs, signing & striping, construction of PCC pavement, AC <br />pavement and driveways along the safe routes of school. <br />Pre -Bid Job Meeting: There is no scheduled pre -bid job walk. <br />Contractor's License Requirements: From the time of City Council contract award until work <br />completion, the Contractor shall possess a valid California Class "A" Contractor's license. All <br />sub -contractors shall be properly licensed for their respective trades. <br />Public Works Construction Permit: The Contractor will be required to obtain a Public Works <br />Construction Permit (refer to Section 2-2a, Construction Permit, of these Special Provisions). The <br />required deposit for this permit shall be as described in the Bid Proposal. <br />Bid Proposal Guaranty: <br />o A scanned cote of the Bid Proposal Guaranty shall be uploaded to PlanetBids along with <br />project bid. Bid Proposal Guaranty shall be in the form of a cashier's or certified check <br />payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount <br />not less than ten percent Q0%) of the bid aggregate, as a guarantee that the Bidder will <br />enter into the proposed contract if the same is awarded. The signature of the bidder on the <br />bid bond must be notarized. <br />o In addition to electronic Bid submittals, Bidders shall deliver an original hard copy of the <br />Bid Proposal Guaranty. For further instructions regarding original Bid Proposal Guaranty <br />submittal, refer to PlanetBids. <br />Failure to provide required documents with Bid may cause the bid to be deemed non- <br />responsive. <br />vii <br />